Supercomputers/Systems/Encanto
USA · decommissioned · hpc
Encanto
Also known as NMCAC SGI Altix ICE 8200
Operated by New Mexico Computing Applications Center at Intel Rio Rancho Data Center (Encanto) .
Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1,350 of 1,581 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.
Measured performance
- Rmax
- 126.90 TFlop/s
- Rpeak
- 172.03 TFlop/s
- Rmax ÷ Rpeak
- 73.8%
- Cores
- 14,336
- Power
- 861 kW
- Per watt
- 0.1 GF/W
Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.
How it compares
Ranked against the other machines in this dataset that report the same figure: those that first came into service within two years of Encanto, and those in USA. Computed from our tables; a metric is ranked only when at least eight peers report it.
| Metric | Value | Against its era | Against its country |
|---|---|---|---|
| Rmax | 126.90 TFlop/s | #23 of 112 · top 20% | #242 of 332 · bottom 28% |
| Energy efficiency | 0.1 GF/W | #42 of 61 · bottom 33% | #154 of 162 · bottom 6% |
| Rmax ÷ Rpeak | 73.8 % | #88 of 112 · bottom 23% | #175 of 331 · bottom 48% |
| Power draw | 861 kW | #18 of 62 · top 28% | #69 of 171 · top 40% |
Every metric is ranked largest-first, so a high power-draw rank means a big power draw, not a good one. Rmax ÷ Rpeak uses HPL-measured results only. Rankings move as machines are added; they describe this dataset, not the world.
What this machine is made of
One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.
| Role | Part | Supplier at build | Quantity | Confidence | Source |
|---|---|---|---|---|---|
| Integrator | - SGI Altix ICE 8200 | SGI HPENYSE
rolls up to Hewlett Packard Enterprise | - | Verified | top500.orgdatacenterknowledge.com |
| CPU | - Intel Xeon X5365 4C 3.0 GHz, 14,336 cores | Intel | - | Reported | top500.orgdatacenterknowledge.com |
| Operating system | SUSE Linux Enterprise Server Operating systems Linux distribution · Open source, commercial support subscription SLES10 with SGI ProPack 5 | SUSE | - | Reported | top500.org |
Engineering, funding and access
What Encanto runs on, who paid for it and how people get time on it. Each line carries who said it and when.
Hardware
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Interconnect and topology | InfiniBand, connected to the National LambdaRail networkTOP500 lists InfiniBand | 2013-01-02 | Press report | datacenterknowledge.comtop500.org |
| Cooling design | Water-cooled SGI Altix ICE 8200 racks with a power load of 32 kW per cabinetData Center Knowledge counts 28 racks of processors | 2013-01-02 | Press report | datacenterknowledge.com |
Software
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Programming and software stack | SUSE Linux Enterprise Server 10 with SGI ProPack 5TOP500 list entry | 2007-11 | Operator stated | top500.org |
Funding
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Funded by | State of New Mexico | 2013-01-02 | Press report | datacenterknowledge.com |
| Stated cost | 20 USD mState funding to build and maintain the machine, as reported by Data Center Knowledge; not an audited purchase price | 2013-01-02 | Press report | datacenterknowledge.com |
The read
SGI Altix ICE 8200 cluster of Intel Xeon X5365 3.0 GHz quad-core processors on InfiniBand, funded by the State of New Mexico and operated by the non-profit New Mexico Computing Applications Center in an Intel data centre in Rio Rancho. TOP500 lists 14,336 cores, 172.03 TFlop/s peak and 861 kW and places it third in the world on the November 2007 list at 126.9 TFlop/s Rmax; its system page also shows a later 133.2 TFlop/s figure. Data Center Knowledge describes about 14,000 cores and 172 trillion calculations per second, water cooling, and the state's later repossession of the machine over unpaid debt. TOP500 is the only source for Rmax, so the tier is reported.
Timeline
- 2007 First operational source
- 2007-11 Listed at #3 on the TOP500 (November 2007) source
- 2012 The State of New Mexico took control of Encanto in the summer of 2012 after NMCAC could no longer afford to maintain it source
- 2013-01-02 With no single buyer found, the state planned to split Encanto by cabinet among New Mexico universities, with UNM seeking 10 racks, NMSU four and New Mexico Tech two source
Public list appearances
Pointers only: rank and edition, linking to the canonical entry. We do not reproduce list tables. See sourcing policy.
Site & facility
Intel Rio Rancho Data Center (Encanto)
- Location
- Rio Rancho, NM, USA
Change history
- 2026-10-02 Added Encanto, New Mexico's SGI Altix ICE 8200, third on the November 2007 TOP500
Nearby in scale
The machines closest to Encanto by Rmax, smaller to larger.
- Vayu (NCI) · Australia, operational · 0.13 PFlop/s
- TSUBAME-KFC · Japan, upgraded · 0.13 PFlop/s
- Volvo Cars E5-2670 Cluster · Sweden, operational · 0.12 PFlop/s
- Jade (CINES) · France, decommissioned · 0.13 PFlop/s
- Midway (UChicago) · USA, operational · 0.13 PFlop/s
- Abisko · Sweden, decommissioned · 0.13 PFlop/s
Source check
We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.
| Cited source | Result | Found on the page |
|---|---|---|
| top500.org | does not name this system | - |
| datacenterknowledge.com | names system only | - |
Checked 2026-10-18 by pnpm verify. Re-run it and the table changes with the web.
Further reading
Inside a node
Latency-optimised versus throughput-optimised processors, NUMA, and the end of the host-to-device copy.
Programming a supercomputer
The software stack beneath the application, and why the OS is now a sovereignty signal as much as a technical choice.
Operating a supercomputer
Acceptance testing, why "installed" and "in production" are six months apart, and the machine lifecycle.