Supercomputers/Systems/HPC7
Italy · operational · mixed
HPC7
Operated by Eni at Eni Green Data Center .
Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1,350 of 1,581 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.
Measured performance
- Rmax
- 571.5 PFlop/s
- Rpeak
- 861.1 PFlop/s
- Rmax ÷ Rpeak
- 66.4%
- Cores
- 3,461,472
- Power
- 8.73 MW
- Per watt
- 65.4 GF/W
Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.
How it compares
Ranked against the other machines in this dataset that report the same figure: those that first came into service within two years of HPC7, and those in Italy. Computed from our tables; a metric is ranked only when at least eight peers report it.
| Metric | Value | Against its era | Against its country |
|---|---|---|---|
| Rmax | 571.5 PFlop/s | #4 of 158 · top 2% | #1 of 21 · highest |
| Energy efficiency | 65.4 GF/W | #6 of 81 · top 6% | #1 of 14 · highest |
| Rmax ÷ Rpeak | 66.4 % | #105 of 155 · bottom 33% | #13 of 20 · bottom 38% |
| Power draw | 8,735 kW | #7 of 85 · top 7% | #1 of 14 · highest |
Every metric is ranked largest-first, so a high power-draw rank means a big power draw, not a good one. Rmax ÷ Rpeak uses HPL-measured results only. Rankings move as machines are added; they describe this dataset, not the world.
What this machine is made of
One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.
| Role | Part | Supplier at build | Quantity | Confidence | Source |
|---|---|---|---|---|---|
| Integrator | - HPE Cray EX255a | Hewlett Packard Enterprise | - | Verified | eni.comtop500.org |
| Accelerator | AMD Instinct MI300A Accelerators ROCm (CDNA 3) · TSMC N5/N6 · 550 W AMD Instinct MI300A | AMD | - | Verified | eni.comtop500.org |
| CPU | AMD 4th Gen EPYC 24C (in MI300A) CPUs x86-64 · 24C · 1.8 GHz · TSMC N5 AMD 4th Gen EPYC 24C 1.8GHz (integrated in MI300A) | AMD | - | Verified | eni.comtop500.org |
| Interconnect | HPE Slingshot-11 Interconnect Dragonfly · 200 Gb/s per port · Around 2 microseconds Slingshot-11 | Hewlett Packard Enterprise | - | Verified | eni.comtop500.org |
| Storage | HPE Cray ClusterStor E2000 Storage HPE Cray ClusterStor E2000 | Hewlett Packard Enterprise | - | Reported | eni.com |
| Cooling | Direct liquid cooling, warm water Cooling Direct-to-chip cold plates, facility water loop · Removes 90+ percent of node heat to liquid innovative liquid cooling system, direct liquid cooling dissipating 96% of heat | Hewlett Packard Enterprise | - | Reported | eni.comdecode39.com |
| Operating system | Red Hat Enterprise Linux Operating systems Linux distribution · Open source, commercial support subscription RHEL 9 | Red Hat | - | Reported | top500.org |
Engineering, funding and access
What HPC7 runs on, who paid for it and how people get time on it. Each line carries who said it and when.
Hardware
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Compute nodes | 3,480 nodesThe release body text says over 3,400 nodes while its technical table gives 3,480 | 2026-06 | Operator stated | eni.com |
| Interconnect and topology | HPE Slingshot-11, 200 Gb/s | 2026-06 | Operator stated | eni.comtop500.org |
| Cooling design | Direct liquid cooling dissipating 96% of generated heat | 2026-06 | Operator stated | eni.com |
Software
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Programming and software stack | RHEL 9, g++ 8.5.0, hipcc 6.4.2, AMD rocBLAS and HPE Cray MPI (as submitted for the TOP500 HPL run) | 2026-06 | Operator stated | top500.org |
Results
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Notable result | 2026: 571.5 PFlop/s Rmax and 6th on the June 2026 TOP500; 11th on the Green500 at 65.426 GFlops/W per Eni | 2026-06 | Operator stated | eni.comtop500.org |
The read
HPC7 shares El Capitan's exact node design, the MI300A APU pairing a 24-core Zen 4 CPU with CDNA 3 GPU chiplets on unified HBM3: two systems built around the same silicon six months apart, one a US stockpile-stewardship machine and the other a European energy company's seismic-imaging cluster. Eni's own release states HPC7 does not replace HPC6, and the pair's combined Rmax already clears an exaflop between them. Eni's own page names artificial intelligence and molecular modeling alongside the oil-and-gas workloads HPC6 already carries, which is why this row is tagged mixed rather than hpc; no independent source has corroborated the AI-use claim specifically.
Timeline
- 2026-06 Announced source
- 2026-06 Listed at #6 on the TOP500 (June 2026) source
- 2026-06 First operational source
- 2026-06 HPC7 debuted at rank 6 on the June 2026 TOP500 with 571.5 PFlop/s Rmax source
- 2026-06 HPC7 placed 11th on the June 2026 Green500 at 65.426 GFlops/W source
Public list appearances
Pointers only: rank and edition, linking to the canonical entry. We do not reproduce list tables. See sourcing policy.
Site & facility
Change history
- 2026-09-22 Gained a Green500 rank pointer (#11 on the 2026-06 list)
Nearby in scale
The machines closest to HPC7 by Rmax, smaller to larger.
Related systems
Same site
- HPC6 · Italy, operational, 2024
- HPC5 · Italy, operational, 2020
- HPC4 · Italy, operational, 2018
- HPC2 · Italy, operational, 2014
Same operator
- HPC1 · Italy, operational, 2013
Same accelerator
- Sirius (Tsukuba) · Japan, operational, 2026
- bwUniCluster 3.0 · Germany, operational, 2025
- Cosmos (SDSC) · USA, operational, 2025
- Hunter · Germany, operational, 2025
- Plasma Simulator Sosei · Japan, operational, 2025
- Tuolumne · USA, operational, 2025
Source check
We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.
| Cited source | Result | Found on the page |
|---|---|---|
| top500.org | names system and part | AMD Instinct MI300A, HPE Slingshot-11, HPE Cray ClusterStor E2000 |
| eni.com | names system and part | AMD Instinct MI300A, Direct liquid cooling, warm water, HPE Cray ClusterStor E2000 |
Checked 2026-10-18 by pnpm verify. Re-run it and the table changes with the web.
Further reading
Inside a node
Why accelerators exist, what the memory hierarchy costs, and how the CPU and accelerator merged onto one package.
Operating a supercomputer
Acceptance testing, why "installed" and "in production" are six months apart, and the machine lifecycle.
The interconnect
Topologies, why latency and tail behaviour matter more than bandwidth, and how the fabric market consolidated.