Supercomputers/Systems/Satori (MIT)
USA · operational · mixed
Satori (MIT)
Also known as Satori
Operated by Massachusetts Institute of Technology at MGHPCC Holyoke .
Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1,350 of 1,581 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.
Measured performance
- Rmax
- 1.46 PFlop/s
- Rpeak
- 1.74 PFlop/s
- Rmax ÷ Rpeak
- 83.9%
- Cores
- 23,040
- Power
- 94 kW
- Per watt
- 15.5 GF/W
Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.
How it compares
Ranked against the other machines in this dataset that report the same figure: those that first came into service within two years of Satori (MIT), and those in USA. Computed from our tables; a metric is ranked only when at least eight peers report it.
| Metric | Value | Against its era | Against its country |
|---|---|---|---|
| Rmax | 1.46 PFlop/s | #189 of 230 · bottom 19% | #161 of 332 · top 48% |
| Energy efficiency | 15.5 GF/W | #26 of 129 · top 20% | #29 of 162 · top 17% |
| Rmax ÷ Rpeak | 83.9 % | #29 of 224 · top 13% | #64 of 331 · top 19% |
| Power draw | 94 kW | #120 of 132 · bottom 10% | #154 of 171 · bottom 11% |
Every metric is ranked largest-first, so a high power-draw rank means a big power draw, not a good one. Rmax ÷ Rpeak uses HPL-measured results only. Rankings move as machines are added; they describe this dataset, not the world.
What this machine is made of
One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.
| Role | Part | Supplier at build | Quantity | Confidence | Source |
|---|---|---|---|---|---|
| Integrator | - IBM POWER9 system built in collaboration with MIT, 64 compute nodes | IBM | - | Reported | mit-satori.github.iotop500.org |
| Accelerator | NVIDIA Tesla V100 Accelerators CUDA (Volta GV100) · 5,120C · 1.53 GHz · 12 nm · 300 W NVIDIA V100 32GB SXM2, four per node with NVLink2 | NVIDIA | - | Reported | mit-satori.github.iotop500.org |
| CPU | - IBM POWER9 20C 2.4GHz | IBM | - | Reported | top500.org |
| Interconnect | Mellanox InfiniBand EDR Interconnect Fat tree · 100 Gb/s per 4x port · About 0.9 microseconds 100 Gb/s InfiniBand EDR | NVIDIA | - | Reported | top500.orgmit-satori.github.io |
Engineering, funding and access
What Satori (MIT) runs on, who paid for it and how people get time on it. Each line carries who said it and when.
Hardware
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Compute nodes | 64 nodesEach node has 1 TB of memory and four NVIDIA V100 GPUs with 32 GB each | 2024 | Operator stated | mit-satori.github.io |
| Total memory | 64 TBDerived: 64 nodes x 1 TB | 2024 | Operator stated | mit-satori.github.io |
| Interconnect and topology | 100 Gb/s InfiniBand (EDR) between nodesMIT's documentation adds NVLink2 links of nearly 200 GB/s bidirectional between the GPUs in each node; TOP500 lists Infiniband EDR | 2024 | Operator stated | mit-satori.github.iotop500.org |
Software
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Programming and software stack | RHEL 7.6; the TOP500 HPL run used NVIDIA binaries and IBM Spectrum MPITOP500 list entry | 2019-11 | Operator stated | top500.org |
Access
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| How researchers get time | MIT students, employees and sponsored guests with active Kerberos credentials request accounts through the Satori web portal | 2024 | Operator stated | mit-satori.github.io |
| Access page | satori-portal.mit.edu | 2024 | Operator stated | mit-satori.github.io |
The read
GPU-dense IBM POWER9 cluster built as an MIT and IBM collaboration and hosted at MGHPCC in Holyoke. MIT's user documentation lists 64 compute nodes with four NVIDIA V100 32GB GPUs each linked by NVLink2 and a 100 Gb/s InfiniBand network. TOP500 lists 23,040 cores and 1.46 PFlop/s Rmax, appearing on three lists from rank 373 in November 2019.
Timeline
Public list appearances
Pointers only: rank and edition, linking to the canonical entry. We do not reproduce list tables. See sourcing policy.
Site & facility
Change history
- 2026-10-02 Added Satori, MIT and IBM's POWER9 GPU cluster
Nearby in scale
The machines closest to Satori (MIT) by Rmax, smaller to larger.
- Salomon · Czechia, decommissioned · 1.46 PFlop/s
- JURECA · Germany, decommissioned · 1.42 PFlop/s
- Spirit (AFRL) · USA, operational · 1.42 PFlop/s
- JADE2 · United Kingdom, operational · 1.47 PFlop/s
- Grizzly · USA, operational · 1.52 PFlop/s
- State Grid SGSystem · China, operational · 1.56 PFlop/s
Related systems
Same site
- Cannon (FASRC) · USA, upgraded, 2019
- Kempner AI Cluster · USA, operational, 2023
- AICR · USA, operational
- Cannon2-H200 · USA, operational, 2025
- Engaging (MIT) · USA, operational
- Explorer (Northeastern) · USA, operational
Same accelerator
- Artemis (G42) · United Arab Emirates, operational, 2019
- Barbora · Czechia, operational, 2019
- Béluga · Canada, decommissioned, 2019
- cHARISMa · Russia, operational, 2019
- Christofari · Russia, operational, 2019
- COBALT 2.0 · Netherlands, operational, 2019
Source check
We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.
| Cited source | Result | Found on the page |
|---|---|---|
| mit-satori.github.io | names system and part | Mellanox InfiniBand EDR |
| top500.org | names system and part | NVIDIA Tesla V100, Mellanox InfiniBand EDR |
Checked 2026-10-18 by pnpm verify. Re-run it and the table changes with the web.
Further reading
Operating a supercomputer
Acceptance testing, why "installed" and "in production" are six months apart, and the machine lifecycle.
Inside a node
Latency-optimised versus throughput-optimised processors, NUMA, and the end of the host-to-device copy.
The interconnect
Topologies, why latency and tail behaviour matter more than bandwidth, and how the fabric market consolidated.