Supercomputers/Systems/Bluefire
USA · decommissioned · hpc
Bluefire
Also known as NCAR Bluefire IBM Power 575
Operated by NCAR .
Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1,350 of 1,581 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.
Measured performance
- Rmax
- 57.73 TFlop/s
- Rpeak
- 76.40 TFlop/s
- Rmax ÷ Rpeak
- 75.6%
- Cores
- 4,064
- Power
- 649 kW
- Per watt
- 0.1 GF/W
Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.
How it compares
Ranked against the other machines in this dataset that report the same figure: those that first came into service within two years of Bluefire, and those in USA. Computed from our tables; a metric is ranked only when at least eight peers report it.
| Metric | Value | Against its era | Against its country |
|---|---|---|---|
| Rmax | 57.73 TFlop/s | #63 of 125 · top 50% | #264 of 332 · bottom 22% |
| Energy efficiency | 0.1 GF/W | #63 of 71 · bottom 12% | #158 of 162 · bottom 3% |
| Rmax ÷ Rpeak | 75.6 % | #91 of 125 · bottom 28% | #155 of 331 · top 47% |
| Power draw | 649 kW | #31 of 72 · top 42% | #79 of 171 · top 46% |
Every metric is ranked largest-first, so a high power-draw rank means a big power draw, not a good one. Rmax ÷ Rpeak uses HPL-measured results only. Rankings move as machines are added; they describe this dataset, not the world.
What this machine is made of
One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.
| Role | Part | Supplier at build | Quantity | Confidence | Source |
|---|---|---|---|---|---|
| Integrator | - Power 575 Hydro-Cluster, p6 4.7 GHz | IBM | - | Reported | top500.orgcisl.ucar.edu |
| CPU | - POWER6 2C 4.7GHz | IBM | - | Reported | top500.orgcisl.ucar.edu |
| Cooling | Direct-to-chip cold plate Cooling Cold plate on the package, air for the remainder · Removes roughly 50-80 percent of node heat to liquid Water-chilled copper plates in direct contact with each POWER6 chip | IBM | - | Reported | cisl.ucar.edu |
| Operating system | IBM AIX Operating systems Unix (System V-derived) · Proprietary AIX | IBM | - | Reported | top500.org |
Engineering, funding and access
What Bluefire runs on, who paid for it and how people get time on it. Each line carries who said it and when.
Hardware
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Compute nodes | 128 nodesIBM Power 575 nodes, each with four dual-chip modules of eight POWER6 cores. | 2013-02 | Operator stated | cisl.ucar.edu |
| Total memory | 12.22 TB | 2013-02 | Operator stated | cisl.ucar.edu |
| Interconnect and topology | Eight-plane DDR InfiniBand | 2013-02 | Operator stated | cisl.ucar.edu |
| Cooling design | Water-chilled copper cold plates on each POWER6 chip, which NCAR says made cooling 33 percent more energy efficient than in earlier air-cooled systems | 2013-02 | Operator stated | cisl.ucar.edu |
Access
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| How researchers get time | Primary production system for NCAR's Climate Simulation Laboratory and the NCAR/UCAR community, with part of its capacity running the Antarctic Mesoscale Prediction System for NSF's Office of Polar Programs | 2013-02 | Operator stated | cisl.ucar.edu |
Results
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Notable result | Generated climate simulations for the IPCC Fifth Assessment Report | 2013-02 | Operator stated | cisl.ucar.edu |
| Notable result | Ran the first comprehensive computer model of sunspots | 2013-02 | Operator stated | cisl.ucar.edu |
| Notable result | 2008 to 2013: more than 162 million core-hours across more than 7.3 million jobs, at 76 percent average utilisation and just over 97 percent availability | 2013-02 | Operator stated | cisl.ucar.edu |
The read
NCAR's IBM Power 575 Hydro-Cluster, a water-cooled POWER6 cluster, 44th on the November 2008 TOP500. TOP500 lists 4,064 POWER6 2-core 4.7 GHz processors on InfiniBand running AIX at 57.73 TFlop/s Rmax and 76.4 TFlop/s Rpeak on that list. NCAR's CISL history page independently confirms 128 Power 575 nodes, 77 teraflops peak, 12.22 TB of memory, water-chilled copper plates on each POWER6 chip, 538.2 kW and a service life from 24 April 2008 to 31 January 2013, during which it delivered more than 162 million core-hours. TOP500 reports 649 kW and CISL 538.2 kW. The physical machine room is not stated in the cited pages, so no site is attached. TOP500 is the only source for Rmax, so the tier is reported.
Timeline
- 2008-04-24 First operational source
- 2008-11 Listed at #44 on the TOP500 (November 2008) source
- 2010-08 Disk space available to Bluefire users rose to 1.6 PB with the first phase of NCAR's GLADE shared disk resource source
- 2013-01-31 Decommissioned source
Public list appearances
Pointers only: rank and edition, linking to the canonical entry. We do not reproduce list tables. See sourcing policy.
Change history
- 2026-10-02 Added Bluefire, NCAR's IBM POWER6 cluster, 44th on the November 2008 TOP500
Nearby in scale
The machines closest to Bluefire by Rmax, smaller to larger.
Related systems
Same operator
- blueice · USA, decommissioned, 2006
- Yellowstone · USA, decommissioned, 2012
- Bluesky · USA, decommissioned, 2002
- Cheyenne · USA, decommissioned, 2016
- Antero 2 (NCAR C90) · USA, decommissioned, 1997
- NCAR Cray T3D · USA, decommissioned, 1994
Source check
We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.
| Cited source | Result | Found on the page |
|---|---|---|
| top500.org | names system only | - |
| cisl.ucar.edu | names system only | - |
Checked 2026-10-18 by pnpm verify. Re-run it and the table changes with the web.
Further reading
Operating a supercomputer
Acceptance testing, why "installed" and "in production" are six months apart, and the machine lifecycle.
Inside a node
Latency-optimised versus throughput-optimised processors, NUMA, and the end of the host-to-device copy.
Programming a supercomputer
The software stack beneath the application, and why the OS is now a sovereignty signal as much as a technical choice.