Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1,350 of 1,581 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.
Measured performance
- Rmax
- 5.18 PFlop/s
- Rpeak
- 10.41 PFlop/s
- Rmax ÷ Rpeak
- 49.8%
- Cores
- 42,336
- Power
- 99 kW
- Per watt
- 52.3 GF/W
Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.
How it compares
Ranked against the other machines in this dataset that report the same figure: those that first came into service within two years of Cosmos (SDSC), and those in USA. Computed from our tables; a metric is ranked only when at least eight peers report it.
| Metric | Value | Against its era | Against its country |
|---|---|---|---|
| Rmax | 5.18 PFlop/s | #154 of 202 · bottom 25% | #79 of 332 · top 24% |
| Energy efficiency | 52.3 GF/W | #31 of 99 · top 31% | #13 of 162 · top 7% |
| Rmax ÷ Rpeak | 49.8 % | #191 of 199 · bottom 5% | #314 of 331 · bottom 6% |
| Power draw | 99 kW | #92 of 104 · bottom 13% | #151 of 171 · bottom 13% |
Every metric is ranked largest-first, so a high power-draw rank means a big power draw, not a good one. Rmax ÷ Rpeak uses HPL-measured results only. Rankings move as machines are added; they describe this dataset, not the world.
What this machine is made of
One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.
| Role | Part | Supplier at build | Quantity | Confidence | Source |
|---|---|---|---|---|---|
| Integrator | - HPE Cray Supercomputing EX2500, 42 nodes | Hewlett Packard Enterprise | - | Reported | sdsc.edutop500.org |
| Accelerator | AMD Instinct MI300A Accelerators ROCm (CDNA 3) · TSMC N5/N6 · 550 W 168 AMD Instinct MI300A APUs, 4 per node | AMD | 168 reported | Reported | sdsc.edu |
| CPU | AMD 4th Gen EPYC 24C (in MI300A) CPUs x86-64 · 24C · 1.8 GHz · TSMC N5 24 Zen4 cores per APU (integrated in MI300A) | AMD | 168 reported | Reported | sdsc.edu |
| Interconnect | HPE Slingshot-11 Interconnect Dragonfly · 200 Gb/s per port · Around 2 microseconds HPE Slingshot dragonfly, 200 GB/s links (TOP500: Slingshot-11) | Hewlett Packard Enterprise | - | Reported | sdsc.edutop500.org |
| Storage | - 200 TB usable VAST flash performance tier | VAST Data | - | Reported | sdsc.edu |
| Operating system | SUSE Linux Enterprise Server Operating systems Linux distribution · Open source, commercial support subscription SLES 15 | SUSE | - | Reported | top500.org |
Engineering, funding and access
What Cosmos (SDSC) runs on, who paid for it and how people get time on it. Each line carries who said it and when.
Hardware
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Compute nodes | 42 nodesFour AMD Instinct MI300A APUs per node, 168 APUs in total, two nodes per blade. | 2026 | Operator stated | sdsc.edu |
| Interconnect and topology | HPE Slingshot (Ethernet-based) in a dragonfly topology | 2026 | Operator stated | sdsc.edu |
Software
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Parallel filesystem | VAST all-flash performance tier (200 TB usable), Ceph capacity tier (5 PB usable, listed as coming soon) and Qumulo NFS homeThe guide also states 300 TB for the VAST tier in its technical details section. | 2026 | Operator stated | sdsc.edu |
| Job scheduler | SlurmSuggested cluster-partition limits of 24 hours and 4 nodes per job during the early user period. | 2026 | Operator stated | sdsc.edu |
| Programming and software stack | SUSE Linux Enterprise Server with HPE Performance Cluster Manager | 2026 | Operator stated | sdsc.edu |
| Programming and software stack | Cray CCE (default), AMD ROCm and GNU compilers via PrgEnv modules; Singularity containers | 2026 | Operator stated | sdsc.edu |
Funding
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Funded by | National Science Foundation | 2026 | Operator stated | sdsc.edu |
| Funding programme | 3-year testbed phase for select projects, workshops and industry interactions, followed by a 2-year allocation phase for the broader NSF community | 2026 | Operator stated | sdsc.edu |
Access
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| How researchers get time | Testbed access requested through SDSC HPC Consulting; users sign the Cosmos Acceptable Use Policy and log in with SSH keysThe guide does not mention ACCESS allocations. | 2026 | Operator stated | sdsc.edu |
The read
NSF-funded (award 2404323) HPE Cray Supercomputing EX2500 system at SDSC with 42 nodes of four AMD Instinct MI300A APUs each, 168 APUs in total, on a Slingshot dragonfly fabric with 200 TB of VAST flash and 5 PB of Ceph. SDSC counts 24 Zen4 cores and 228 GPU compute units per APU. TOP500 lists 42,336 cores, 5.18 PFlop/s Rmax, 10.41 PFlop/s Rpeak and about 99 kW, 272nd in November 2025 and 297th in June 2026. SDSC and TOP500 agree on the platform, but the HPL figures come from TOP500 alone, so the tier is reported.
Timeline
- 2024 Announced source
- 2025 First operational source
- 2025-11 Listed at #272 on the TOP500 (November 2025) source
Public list appearances
Pointers only: rank and edition, linking to the canonical entry. We do not reproduce list tables. See sourcing policy.
Site & facility
Change history
- 2026-10-02 Added Cosmos, SDSC's NSF-funded MI300A system, 272nd on the November 2025 TOP500
Nearby in scale
The machines closest to Cosmos (SDSC) by Rmax, smaller to larger.
- Stampede · USA, decommissioned · 5.17 PFlop/s
- Nano 4 GB200 · Taiwan, operational · 5.16 PFlop/s
- TX-GAIA · USA, operational · 5.16 PFlop/s
- Tursa · United Kingdom, operational · 5.23 PFlop/s
- CLAIX-2023 · Germany, operational · 5.24 PFlop/s
- Berzelius · Sweden, operational · 5.25 PFlop/s
Related systems
Same site
- Expanse2 · USA, planned
- Voyager · USA, operational, 2022
- Expanse · USA, operational, 2020
- Comet · USA, decommissioned, 2015
- Gordon · USA, decommissioned, 2012
- Trestles (SDSC) · USA, decommissioned, 2010
Same operator
- DataStar · USA, decommissioned, 2004
- Intimidata · USA, operational, 2004
- Blue Horizon · USA, decommissioned, 2000
Same accelerator
- bwUniCluster 3.0 · Germany, operational, 2025
- Hunter · Germany, operational, 2025
- Plasma Simulator Sosei · Japan, operational, 2025
- Tuolumne · USA, operational, 2025
- Viper-GPU · Germany, operational, 2025
- Adastra 2 · France, operational, 2024
Source check
We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.
| Cited source | Result | Found on the page |
|---|---|---|
| top500.org | names system and part | AMD Instinct MI300A, HPE Slingshot-11 |
| sdsc.edu | names system, part and count | AMD Instinct MI300A, SUSE Linux Enterprise Server · counts: 168, 168 |
Checked 2026-10-18 by pnpm verify. Re-run it and the table changes with the web.
Further reading
Operating a supercomputer
Acceptance testing, why "installed" and "in production" are six months apart, and the machine lifecycle.
Inside a node
Why accelerators exist, what the memory hierarchy costs, and how the CPU and accelerator merged onto one package.
The interconnect
Topologies, why latency and tail behaviour matter more than bandwidth, and how the fabric market consolidated.