Supercomputers/Systems/Cherry Creek
USA · operational · hpc
Cherry Creek
Also known as UNLV Cherry Creek; Intel Cherry Creek cluster
Operated by UNLV at Switch SUPERNAP Las Vegas (UNLV) .
Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1,350 of 1,581 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.
Measured performance
- Rmax
- 193.86 TFlop/s
- Rpeak
- 355.91 TFlop/s
- Rmax ÷ Rpeak
- 54.5%
- Cores
- 18,249
- Power
- 222.5 kW
- Per watt
- 0.9 GF/W
Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.
How it compares
Ranked against the other machines in this dataset that report the same figure: those that first came into service within two years of Cherry Creek, and those in USA. Computed from our tables; a metric is ranked only when at least eight peers report it.
| Metric | Value | Against its era | Against its country |
|---|---|---|---|
| Rmax | 193.86 TFlop/s | #216 of 230 · bottom 7% | #235 of 332 · bottom 30% |
| Energy efficiency | 0.9 GF/W | #158 of 180 · bottom 13% | #110 of 162 · bottom 33% |
| Rmax ÷ Rpeak | 54.5 % | #207 of 226 · bottom 9% | #299 of 331 · bottom 11% |
| Power draw | 223 kW | #137 of 182 · bottom 26% | #124 of 171 · bottom 29% |
Every metric is ranked largest-first, so a high power-draw rank means a big power draw, not a good one. Rmax ÷ Rpeak uses HPL-measured results only. Rankings move as machines are added; they describe this dataset, not the world.
What this machine is made of
One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.
| Role | Part | Supplier at build | Quantity | Confidence | Source |
|---|---|---|---|---|---|
| Integrator | - Intel Cluster (Cherry Creek) built on Supermicro FatTwin servers | Intel | - | Verified | top500.orgunlv.edu |
| Accelerator | - Intel Xeon Phi 7120P coprocessors, three per node in the initial 48-node configuration | Intel | - | Verified | top500.orgunlv.edu |
| CPU | Intel Xeon E5-2697 v2 CPUs x86-64 · 12C · 2.7 GHz · 22 nm · 130 W Intel Xeon E5-2697 v2 12C 2.7GHz, dual-socket nodes (plus Xeon E5-2640 v3 hosts in the TOP500 configuration) | Intel | - | Verified | top500.orgunlv.edu |
| Interconnect | - Intel True Scale QDR fabric | Intel | - | Verified | top500.orgunlv.edu |
Engineering, funding and access
What Cherry Creek runs on, who paid for it and how people get time on it. Each line carries who said it and when.
Hardware
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Compute nodes | 48 nodesInitial configuration of 12 Supermicro FatTwin chassis with 48 half-width nodes in two racks; the June 2015 TOP500 entry describes a larger 18,249-core system | 2014-09 | Operator stated | unlv.edu |
| Total memory | 6.144 TBDerived: 48 nodes x 128 GB Micron DDR3 = 6,144 GB, initial configuration | 2014-09 | Operator stated | unlv.edu |
Software
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Programming and software stack | Red Hat Enterprise Linux 6TOP500 lists CentOS for the June 2015 entry | 2014-09 | Operator stated | unlv.edu |
| Programming and software stack | Intel Composer XE 2013 compilers and Intel Math Kernel Library | 2014-09 | Operator stated | unlv.edu |
| Programming and software stack | Intel MPI | 2014-09 | Operator stated | unlv.edu |
Funding
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Funded by | Intel, which awarded UNLV the use of the Cherry Creek systemThe release does not say whether the system was donated or loaned | 2014-09 | Operator stated | unlv.edu |
| Funded by | Switch, which donated hosting services at its SUPERNAP data centre in Las Vegas | 2014-09 | Operator stated | unlv.edu |
Access
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| How researchers get time | Used by UNLV researchers and their research partners, with UNLV staff maintaining the system and scheduling time; part of the system is reserved for private-sector investment in university research through UNLV and Switch SUPERNAP | 2014-09 | Operator stated | unlv.edu |
The read
Intel's Cherry Creek cluster, made available to UNLV's National Supercomputing Institute and hosted at Switch's SUPERNAP data center in Las Vegas. UNLV's September 2014 announcement describes a 48-node cluster in two racks of Supermicro FatTwin servers, each node with dual Xeon E5-2697v2, three Xeon Phi 7120P coprocessors, 128GB of DDR3 and Intel True Scale fabric, with 131.5 TFlop/s Linpack, 198.8 TFlop/s peak and 74 kW for that initial configuration. The TOP500 entry for June 2015 (rank 394) lists the larger Intel Cluster of 18,249 cores mixing Xeon E5-2640v3 and E5-2697v2 hosts with Xeon Phi SE10/7120/7120P on True Scale QDR, Rmax 193.9 and Rpeak 355.9 TFlop/s at 222.5 kW, running CentOS.
Timeline
- 2014-09-17 Announced source
- 2015 First operational source
- 2015-06 Listed at #394 on the TOP500 (June 2015) source
Public list appearances
Pointers only: rank and edition, linking to the canonical entry. We do not reproduce list tables. See sourcing policy.
Site & facility
Change history
- 2026-10-09 Added Cherry Creek
Nearby in scale
The machines closest to Cherry Creek by Rmax, smaller to larger.
Source check
We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.
| Cited source | Result | Found on the page |
|---|---|---|
| top500.org | names system and part | Intel Xeon E5-2697 v2 |
| unlv.edu | names system and part | Intel Xeon E5-2697 v2 |
Checked 2026-10-18 by pnpm verify. Re-run it and the table changes with the web.
Further reading
Operating a supercomputer
Acceptance testing, why "installed" and "in production" are six months apart, and the machine lifecycle.
Inside a node
Latency-optimised versus throughput-optimised processors, NUMA, and the end of the host-to-device copy.
The interconnect
Topologies, why latency and tail behaviour matter more than bandwidth, and how the fabric market consolidated.