COMPUTE ATLAS Supercomputer supply-chain graph
1153 systems 482 sites Sourced data

Supercomputers/Systems/MareNostrum 5 AI

Spain · under construction · ai training

MareNostrum 5 AI

Also known as MareNostrum 5 AI Upgrade; BSC AI Factory system

Operated by Barcelona Supercomputing Center at Barcelona Supercomputing Center .

Phase 1 seed dataset, compiled by hand. These rows were built from public operator, laboratory and vendor sources. A mechanical second-reader pass has since fetched every cited source: 1092 of 1153 systems have a readable citation that names them, and 40 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.

Measured performance

Rmax
-
Rpeak
-
Rmax ÷ Rpeak
-
Cores
-
Power
-
Per watt
- GF/W

Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.

What this machine is made of

One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.

Role Part Supplier at build Quantity Confidence Source
Integrator -
Fsas Technologies led the consortium that won the EuroHPC contract
Fsas Technologies
6702TSE rolls up to Fujitsu
- Reported bsc.eseurohpc-ju.europa.eu
Integrator -
Telefonica co-led the consortium that won the EuroHPC contract
Telefonica
- Reported bsc.eseurohpc-ju.europa.eu
Integrator -
Supermicro compute hardware
Supermicro - Reported bsc.es
Accelerator -
NVIDIA accelerators for the LLM training and inference partitions, model not published
NVIDIA - Reported bsc.es
Storage -
IBM storage for the new AI-oriented file system
IBM - Reported bsc.es
Storage VAST Data Platform
Storage
Disaggregated shared-everything
VAST storage systems for the new AI-oriented file system
VAST Data
- Reported bsc.es

The read

The AI upgrade of MareNostrum 5 for the BSC AI Factory: two new partitions, one for training large language models and one for inference, plus a new AI-oriented file system. EuroHPC signed with a consortium led by Fsas Technologies and Telefonica on 26 January 2026 (EUR 129 million, half EuroHPC and half Spain, Portugal and Turkiye). BSC names Supermicro hardware, NVIDIA accelerators and software, and IBM and VAST storage, with installation scheduled for the first half of 2026 at BSC's headquarters data center and the Torre Girona chapel. Accelerator model and counts are not published and no commissioning notice was found, so it stays under construction.

Timeline

Site & facility

Barcelona Supercomputing Center

Location
Barcelona, Spain
Cooling
Direct liquid cooling
Commissioned
2005

Change history

Source check

We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.

Cited sourceResultFound on the page
eurohpc-ju.europa.eunames system only-
bsc.esnames system and partVAST Data Platform

Checked 2026-10-09 by pnpm verify. Re-run it and the table changes with the web.

Further reading