COMPUTE ATLAS Supercomputer supply-chain graph
1581 systems 558 sites Sourced data

Supercomputers/Systems/Zenith

United Kingdom · operational · ai training

Zenith

Also known as Zenith (MI355X); Cambridge AIRR AMD system

Operated by University of Cambridge at University of Cambridge (CSD3) .

Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1,350 of 1,581 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.

Measured performance

Rmax
-
Rpeak
-
Rmax ÷ Rpeak
-
Cores
-
Power
-
Per watt
- GF/W

Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.

What this machine is made of

One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.

Role Part Supplier at build Quantity Confidence Source
Integrator -
Dell Technologies PowerEdge servers
Dell Technologies - Reported gov.ukdocs.hpc.cam.ac.uk
Accelerator AMD Instinct MI355X
Accelerators
AMD Instinct MI355X GPUs, 8 per node with 288 GiB of memory each
AMD - Reported docs.hpc.cam.ac.ukgov.uk
CPU AMD EPYC 9575F
CPUs
64C · 3.3 GHz
2x AMD EPYC 9575F processors per node
AMD - Reported docs.hpc.cam.ac.uk

Engineering, funding and access

What Zenith runs on, who paid for it and how people get time on it. Each line carries who said it and when.

Software

ItemDetailAs ofBasisSource
Job schedulerSlurm, mi355x partition; projects named NAME-ZENITH-GPU billed in GPU hours2026Operator stateddocs.hpc.cam.ac.uk
Programming and software stackROCm (amdclang, amdclang++, amdflang, amd-smi), compile target gfx9502026Operator stateddocs.hpc.cam.ac.uk
Programming and software stackGCC and Open MPI (tied to the ROCm compilers); Python installed by users via venv, Miniforge or uv2026Operator stateddocs.hpc.cam.ac.uk

Funding

ItemDetailAs ofBasisSource
Funded byUK Government (DSIT), GBP 36 million to raise Cambridge AI Research Resource capacity sixfoldAnnounced 26 January 20262026-01Operator statedgov.uk
Funded byUKRI under the UK AI Research Resource (grant ST/Z000890/1) and the National Compute Resource (grant UKRI4064)2026Operator stateddocs.hpc.cam.ac.uk
Funding programmeUK AI Research Resource (AIRR)2026Operator statedgov.ukdocs.hpc.cam.ac.uk
ProcurementDell Technologies PowerEdge servers with AMD Instinct MI355X GPUs; StackHPC supplies the AI software stackGovernment release says capacity would arrive as early as spring 2026; Cambridge documentation records early access from August 20262026-01Operator statedgov.ukdocs.hpc.cam.ac.uk

Access

ItemDetailAs ofBasisSource
How researchers get timeCambridge Access Portal (Waldur), early access by invitation only; AIRR gives free access to UK researchers, start-ups and small businesses2026Operator stateddocs.hpc.cam.ac.ukgov.uk
Access pagedocs.hpc.cam.ac.uk/user-guide/zenith-quickstart.html2026Operator stateddocs.hpc.cam.ac.uk

The read

Cambridge's AMD Instinct MI355X system in the UK AI Research Resource, funded by a GBP 36 million government award announced on 26 January 2026 to raise Cambridge AIRR capacity sixfold, with Dell Technologies PowerEdge servers. Cambridge's documentation lists nodes of 8 MI355X GPUs (288 GiB each) and two AMD EPYC 9575F CPUs, and says the nodes entered early access service in August 2026. Node count, total GPU count and FLOPS are not published, so no quantities are recorded.

Timeline

Site & facility

University of Cambridge (CSD3)

Location
Cambridge, United Kingdom
Commissioned
2024

Change history

Same site

  • Dawn · United Kingdom, operational, 2024
  • Wilkes-3 · United Kingdom, operational, 2021
  • Cumulus Cascade Lake · United Kingdom, operational, 2020
  • Peta4 · United Kingdom, upgraded, 2017
  • Wilkes-2 · United Kingdom, decommissioned, 2017

Same operator

Same accelerator

  • Sunrise · United Kingdom, operational, 2026

Source check

We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.

Cited sourceResultFound on the page
docs.hpc.cam.ac.uknames system and partAMD Instinct MI355X, AMD EPYC 9575F
gov.ukdoes not name this systemAMD Instinct MI355X, AMD EPYC 9575F

Checked 2026-10-18 by pnpm verify. Re-run it and the table changes with the web.

Further reading