COMPUTE ATLAS Supercomputer supply-chain graph
1581 systems 558 sites Sourced data

Supercomputers/Systems/Hon Hai Kaohsiung Super Computing Center

Taiwan · under construction · mixed

Hon Hai Kaohsiung Super Computing Center

Also known as Foxconn Kaohsiung GB200 NVL72 supercomputer

Operated by Hon Hai Technology Group (Foxconn) .

Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1,350 of 1,581 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.

Measured performance

Rmax
-
Rpeak
-
Rmax ÷ Rpeak
-
Cores
-
Power
-
Per watt
- GF/W

Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.

What this machine is made of

One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.

Role Part Supplier at build Quantity Confidence Source
Integrator -
Built by Ingrasys, Foxconn's data-center equipment subsidiary
Ingrasys - Reported nextplatform.com
Accelerator NVIDIA GB200 NVL72
Accelerators
Arm CPU + CUDA GPU · TSMC 4NP
64 racks of NVIDIA GB200 NVL72, 72 Blackwell GPUs per rack (4,608 GPUs in total)
NVIDIA 64
reported
Verified foxconn.comblogs.nvidia.com
CPU NVIDIA Grace
CPUs
Armv9 (Neoverse V2) · 72C · 3.1 GHz · TSMC 4N
36 NVIDIA Grace CPUs per GB200 NVL72 rack x 64 racks (derived total)
NVIDIA 2,304
estimated
Reported blogs.nvidia.com
Interconnect NVIDIA NVLink 5 / NVSwitch
Interconnect
All-to-all within an NVLink domain · 1.8 TB/s per GPU
NVLink Switch joins each 72-GPU rack into one NVLink domain, 130 TB/s per rack
NVIDIA - Reported blogs.nvidia.com

Engineering, funding and access

What Hon Hai Kaohsiung Super Computing Center runs on, who paid for it and how people get time on it. Each line carries who said it and when.

Software

ItemDetailAs ofBasisSource
Programming and software stackNVIDIA Omniverse and Isaac robotics platforms for digital twins and robotic automation2024-10Operator statedfoxconn.comblogs.nvidia.com
Programming and software stackNVIDIA NIM microservices for Foxconn's domain-specific large language models2024-10Vendor statedblogs.nvidia.com

AI datacenter metrics

Figures beyond an accelerator count, each with who stated it. What can and cannot be compared across AI datacenters.

MetricValueAs ofBasisNoteSource
Accelerators 4,608 accelerators 2024-06 Design target 64 GB200 NVL72 racks, completion target 2026 per Hon Hai release (Jun 2024). Plan; no later operator statement fetched. foxconn.com

The read

Foxconn's AI computing center in Kaohsiung, announced with NVIDIA on 4 June 2024 and detailed at Hon Hai Tech Day on 7 October 2024: 64 racks of NVIDIA GB200 NVL72 (72 Blackwell GPUs and 36 Grace CPUs per rack, 4,608 GPUs in total), with over 90 exaflops of AI performance claimed (low-precision AI figure, so no FLOPS field is filled). Foxconn and NVIDIA both state the 64-rack, 4,608-GPU configuration. The build is by Foxconn subsidiary Ingrasys per The Next Platform; the first phase was targeted for mid-2025 and full deployment for 2026, for cancer research, LLM development, smart-manufacturing, smart-EV and smart-city work. No later source confirming the current state was found, so status stays under_construction as of the last source date. Network fabric, storage and power are not disclosed.

Timeline

  • 2024-06-04 Announced source
  • 2024-10-07 Construction was under way when Foxconn detailed the 64-rack GB200 NVL72 build at Hon Hai Tech Day, with the first phase due by mid-2025 source

Change history

Nearby in scale

The machines closest to Hon Hai Kaohsiung Super Computing Center by accelerator count, smaller to larger.

Same accelerator

Source check

We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.

Cited sourceResultFound on the page
blogs.nvidia.comnames system, part and countNVIDIA GB200 NVL72, NVIDIA Grace, NVIDIA NVLink 5 / NVSwitch · counts: 64
foxconn.comnames system, part and countNVIDIA GB200 NVL72 · counts: 64

Checked 2026-10-18 by pnpm verify. Re-run it and the table changes with the web.

Further reading