Supercomputers/Systems/Tryton Plus
Poland · operational · hpc
Tryton Plus
Also known as TASK Tryton Plus
Operated by CI TASK at CI TASK Data Centre (Gdansk) .
Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1,350 of 1,581 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.
Measured performance
- Rmax
- 1.73 PFlop/s
- Rpeak
- 2.82 PFlop/s
- Rmax ÷ Rpeak
- 61.3%
- Cores
- 30,432
- Power
- 307 kW
- Per watt
- 5.6 GF/W
Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.
How it compares
Ranked against the other machines in this dataset that report the same figure: those that first came into service within two years of Tryton Plus, and those in Poland. Computed from our tables; a metric is ranked only when at least eight peers report it.
| Metric | Value | Against its era | Against its country |
|---|---|---|---|
| Rmax | 1.73 PFlop/s | #201 of 210 · bottom 5% | #9 of 19 · top 44% |
| Energy efficiency | 5.6 GF/W | #73 of 109 · bottom 34% | #3 of 11 · top 20% |
| Rmax ÷ Rpeak | 61.3 % | #169 of 207 · bottom 19% | #16 of 19 · bottom 18% |
| Power draw | 307 kW | #86 of 112 · bottom 24% | #10 of 11 · bottom 11% |
Every metric is ranked largest-first, so a high power-draw rank means a big power draw, not a good one. Rmax ÷ Rpeak uses HPL-measured results only. Rankings move as machines are added; they describe this dataset, not the world.
What this machine is made of
One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.
| Role | Part | Supplier at build | Quantity | Confidence | Source |
|---|---|---|---|---|---|
| Integrator | - Huawei CH121L V5 liquid-cooled nodes | Huawei | - | Verified | top500.orgdocs.task.gda.pl |
| CPU | - Xeon Platinum 8268 24C 2.9GHz, 1,268 processors | Intel | 1,268 reported | Verified | top500.orgdocs.task.gda.pl |
| Interconnect | Mellanox InfiniBand EDR Interconnect Fat tree · 100 Gb/s per 4x port · About 0.9 microseconds InfiniBand EDR 100 Gbps fat tree | NVIDIA | - | Verified | top500.orgdocs.task.gda.pl |
Engineering, funding and access
What Tryton Plus runs on, who paid for it and how people get time on it. Each line carries who said it and when.
Hardware
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Compute nodes | 634 nodesCPU servers (1,268 processors, 30,432 cores); a 16-node GPU partition is listed separately. Both pages are CI TASK's. | 2026 | Operator stated | docs.task.gda.pltask.gda.pl |
| Total memory | 166 TBCPU partition, with 192 or 384 GB per server | 2026 | Operator stated | docs.task.gda.pltask.gda.pl |
| Cooling design | Direct liquid cooling of the Huawei CH121L V5 nodes through CDU heat exchangers in 3 of the 18 cabinets | 2026 | Operator stated | docs.task.gda.pl |
Software
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Programming and software stack | CentOS with precompiled Intel binaries, Intel MKL and Intel MPITOP500 list entry (HPL submission) | 2021-06 | Operator stated | top500.org |
Funding
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Funding programme | PRACE-LAB project (1 January 2019 to 31 December 2023), under which it was bought in mid-2021 | 2021 | Operator stated | docs.task.gda.pltask.gda.pl |
Access
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| How researchers get time | Free for scientific research by people affiliated with scientific institutions: users create an SSO account with an institutional email, apply for or join a computing grant, log in via kdm.task.gda.pl and file yearly reports | 2026 | Operator stated | task.gda.pl |
| Access page | task.gda.pl/en/resources/supercomputer/access-to-ci-task-computing-resourcesCI TASK access page with the user and computing grant application forms | 2026 | Operator stated | task.gda.pl |
The read
Liquid-cooled Huawei CH121L V5 cluster at CI TASK, Gdansk University of Technology, bought in mid-2021 through the PRACE-LAB project. TOP500 lists 30,432 cores of Xeon Platinum 8268 24C 2.9GHz on InfiniBand EDR, 1.73 PFlop/s Rmax, 2.82 PFlop/s Rpeak and 307 kW running CentOS; it ranked 360th in June 2021 (entry recorded here) and 462nd in June 2022. TASK documentation lists 634 servers with 1,268 processors and 166 TB of RAM on a fat-tree EDR fabric, plus a 16-node GPU partition of A100 80GB cards, quoting 3.8 PFLOPS overall.
Timeline
Public list appearances
Pointers only: rank and edition, linking to the canonical entry. We do not reproduce list tables. See sourcing policy.
Site & facility
Change history
- 2026-10-02 Added Tryton Plus, CI TASK
Nearby in scale
The machines closest to Tryton Plus by Rmax, smaller to larger.
Related systems
Same site
- Kraken-Fregata · Poland, operational, 2024
- Tryton · Poland, decommissioned, 2015
- Galera Plus · Poland, operational, 2011
- Galera · Poland, decommissioned, 2008
Source check
We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.
| Cited source | Result | Found on the page |
|---|---|---|
| docs.task.gda.pl | names system and part | Mellanox InfiniBand EDR |
| top500.org | names system and part | Mellanox InfiniBand EDR |
Checked 2026-10-18 by pnpm verify. Re-run it and the table changes with the web.
Further reading
Operating a supercomputer
Acceptance testing, why "installed" and "in production" are six months apart, and the machine lifecycle.
Inside a node
Latency-optimised versus throughput-optimised processors, NUMA, and the end of the host-to-device copy.
The interconnect
Topologies, why latency and tail behaviour matter more than bandwidth, and how the fabric market consolidated.