COMPUTE ATLAS Supercomputer supply-chain graph
1153 systems 482 sites Sourced data

Supercomputers/Systems/Nebius Iceland Cluster

Iceland · operational · ai training

Nebius Iceland Cluster

Deep dive: How Nebius and Nscale build GPU clouds

Also known as Nebius Keflavik; Nebius Verne Iceland H200 cluster

Operated by Nebius at Verne Iceland Campus (Keflavik) .

Phase 1 seed dataset, compiled by hand. These rows were built from public operator, laboratory and vendor sources. A mechanical second-reader pass has since fetched every cited source: 1092 of 1153 systems have a readable citation that names them, and 40 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.

Measured performance

Rmax
-
Rpeak
-
Rmax ÷ Rpeak
-
Cores
-
Power
-
Per watt
- GF/W

Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.

What this machine is made of

One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.

Role Part Supplier at build Quantity Confidence Source
Integrator -
Nebius deploys and operates the cluster colocated at Verne's Keflavik campus
Nebius - Reported nebius.com
Integrator -
Verne provides the colocation data center and renewable power at Keflavik
Verne
- Reported verne.co
Accelerator NVIDIA H200 SXM
Accelerators
CUDA (Hopper GH100) · 16,896C · 1.98 GHz · TSMC 4N · 700 W
NVIDIA H200 GPUs in a 10 MW Nebius cluster (GPU count not stated)
NVIDIA - Reported verne.conebius.com

AI datacenter metrics

Figures beyond an accelerator count, each with who stated it. What can and cannot be compared across AI datacenters.

MetricValueAs ofBasisNoteSource
IT power 10 MW 2025-03 Operator stated 10 MW compute cluster at Verne Keflavik; Nebius and Verne both state the figure. nebius.comverne.co

How it is powered

SourceProviderMWStatusAs ofBasisNoteSource link
Hydro Verne - operating 2025-03 Operator stated Nebius 10 MW cluster at Verne Keflavik runs on Iceland hydroelectric and geothermal power per both Verne and Nebius. No split by source disclosed. verne.conebius.com
Geothermal Verne - operating 2025-03 Operator stated Nebius 10 MW cluster at Verne Keflavik runs on Iceland hydroelectric and geothermal power per both Verne and Nebius. No split by source disclosed. verne.conebius.com

How AI campuses are powered: capacities are what the operator, utility or filing states, not what has been delivered.

The read

A 10 MW cluster of NVIDIA H200 GPUs that Nebius colocates at Verne's data center campus in Keflavik, Iceland, announced on 11 March 2025; Verne calls it the largest single implementation in its Iceland history. Nebius's own blog says the capacity was expected to be fully operational by the end of March 2025 and gives the 10 MW figure; the H200 model comes from Verne's release. Neither page gives a GPU count, so quantity is left blank, and no fetched page confirms the final go-live date. Powered by Iceland's hydroelectric and geothermal energy. It has never submitted an HPL result.

Timeline

Site & facility

Verne Iceland Campus (Keflavik)

Location
Keflavik, Iceland
Cooling
85% liquid cooled, 15% air cooled (Nscale deployment)

Change history

Source check

We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.

Cited sourceResultFound on the page
nebius.comnames system and partNVIDIA H200 SXM
verne.conames system and partNVIDIA H200 SXM

Checked 2026-10-09 by pnpm verify. Re-run it and the table changes with the web.

Further reading