COMPUTE ATLAS Supercomputer supply-chain graph
1581 systems 558 sites Sourced data

Supercomputers/Systems/ForHLR I

Germany · decommissioned · hpc

ForHLR I

Also known as Forschungshochleistungsrechner ForHLR Phase I

Operated by Karlsruhe Institute of Technology at KIT Scientific Computing Centre (Karlsruhe) .

Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1,350 of 1,581 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.

Measured performance

Rmax
206.30 TFlop/s
HPL measured
Rpeak
216.00 TFlop/s
Rmax ÷ Rpeak
95.5%
Cores
10,800
Power
205 kW
Per watt
1.0 GF/W

Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.

How it compares

Ranked against the other machines in this dataset that report the same figure: those that first came into service within two years of ForHLR I, and those in Germany. Computed from our tables; a metric is ranked only when at least eight peers report it.

MetricValueAgainst its eraAgainst its country
Rmax206.30 TFlop/s#207 of 245 · bottom 17%#73 of 95 · bottom 24%
Energy efficiency1.0 GF/W#132 of 198 · bottom 35%#57 of 68 · bottom 17%
Rmax ÷ Rpeak95.5 %#5 of 243 · top 2%#5 of 94 · top 4%
Power draw205 kW#154 of 199 · bottom 24%#48 of 69 · bottom 32%

Every metric is ranked largest-first, so a high power-draw rank means a big power draw, not a good one. Rmax ÷ Rpeak uses HPL-measured results only. Rankings move as machines are added; they describe this dataset, not the world.

What this machine is made of

One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.

Role Part Supplier at build Quantity Confidence Source
Integrator -
MEGWARE MiriQuid cluster
MEGWARE
- Reported top500.orgscc.kit.edu
CPU -
Intel Xeon E5-2670v2 10C 2.5 GHz (Ivy Bridge-EP), 512 thin nodes plus 16 fat nodes
Intel - Reported top500.orgscc.kit.edu
Interconnect Mellanox InfiniBand FDR
Interconnect
Fat tree · 56 Gb/s per 4x port · About 1 microsecond
InfiniBand 4X FDR
Mellanox
NVDANASDAQ rolls up to NVIDIA
- Reported top500.orgscc.kit.edu
Operating system Red Hat Enterprise Linux
Operating systems
Linux distribution · Open source, commercial support subscription
Red Hat Enterprise Linux 6
Red Hat
IBMNYSE rolls up to IBM
- Reported top500.orgscc.kit.edu

Engineering, funding and access

What ForHLR I runs on, who paid for it and how people get time on it. Each line carries who said it and when.

Hardware

ItemDetailAs ofBasisSource
Compute nodes540 nodes512 thin nodes (20 cores, 64 GB), 16 fat nodes (32 cores, 512 GB), 2 login and 10 service nodes2020Operator statedscc.kit.edu
Total memory41.1 TB2020Operator statedscc.kit.edu
Interconnect and topologyInfiniBand 4X FDR2020Operator statedscc.kit.edu

Software

ItemDetailAs ofBasisSource
Parallel filesystemGlobal Lustre file system on a separate InfiniBand network, with a WORK area of about 224 TB, a 1 GB HOME for configuration files and project data in PROJECT2020Operator statedscc.kit.edu
Programming and software stackKITE open environment for running heterogeneous compute clustersOperating system Red Hat Enterprise Linux 6.x2020Operator statedscc.kit.edu

Funding

ItemDetailAs ofBasisSource
Funded byState of Baden-Wuerttemberg and the federal government, jointly2020Operator statedscc.kit.edu

Access

ItemDetailAs ofBasisSource
How researchers get timeComputing time was granted on project proposals reviewed by a steering committee; the project manager signed an access form sent to the SCC ServiceDeskHistorical; SCC ran the system from late September 2014 to April 20202020Operator statedscc.kit.edu

The read

First phase of the research high-performance computer jointly funded by Baden-Wuerttemberg and the federal government, run by KIT's Steinbuch Centre for Computing. KIT's page says SCC operated it from late September 2014 to April 2020 and describes 512 thin nodes (20 cores, 64 GB) and 16 fat nodes (32 cores, 512 GB) of Intel Xeon Ivy Bridge-EP, 540 nodes in all, FDR InfiniBand, 216 TFlop/s theoretical peak, 41.1 TB of memory, RHEL 6 and Lustre. TOP500 lists the MEGWARE MiriQuid system from June 2014 (243rd) to June 2015 with 10,800 cores, 206.3 TFlop/s Rmax, 216 TFlop/s Rpeak and 205 kW. Two independent organisations agree on the hardware, so the tier is verified. Successor ForHLR II is a separate entry.

Timeline

  • 2014-06 Listed at #243 on the TOP500 (June 2014) source
  • 2014-09 First operational source
  • 2020-04 Decommissioned source

Public list appearances

Pointers only: rank and edition, linking to the canonical entry. We do not reproduce list tables. See sourcing policy.

Site & facility

Change history

Nearby in scale

The machines closest to ForHLR I by Rmax, smaller to larger.

Same site

Same operator

Source check

We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.

Cited sourceResultFound on the page
top500.orgnames system and partMellanox InfiniBand FDR
scc.kit.edunames system and partMellanox InfiniBand FDR

Checked 2026-10-18 by pnpm verify. Re-run it and the table changes with the web.

Further reading