Supercomputers/Systems/ABCI 3.0
Japan · operational · ai training
ABCI 3.0
Operated by AIST at ABCI Data Center, Kashiwa .
Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1,350 of 1,581 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.
Measured performance
- Rmax
- 145.1 PFlop/s
- Rpeak
- 181.5 PFlop/s
- Rmax ÷ Rpeak
- 79.9%
- Cores
- 479,232
- Power
- 3.60 MW
- Per watt
- 40.3 GF/W
Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.
How it compares
Ranked against the other machines in this dataset that report the same figure: those that first came into service within two years of ABCI 3.0, and those in Japan. Computed from our tables; a metric is ranked only when at least eight peers report it.
| Metric | Value | Against its era | Against its country |
|---|---|---|---|
| Rmax | 145.1 PFlop/s | #14 of 202 · top 6% | #2 of 131 · top 1% |
| Energy efficiency | 40.3 GF/W | #54 of 99 · bottom 47% | #7 of 74 · top 8% |
| Rmax ÷ Rpeak | 79.9 % | #72 of 199 · top 36% | #54 of 130 · top 41% |
| Power draw | 3,596 kW | #15 of 104 · top 14% | #3 of 74 · top 3% |
Every metric is ranked largest-first, so a high power-draw rank means a big power draw, not a good one. Rmax ÷ Rpeak uses HPL-measured results only. Rankings move as machines are added; they describe this dataset, not the world.
What this machine is made of
One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.
| Role | Part | Supplier at build | Quantity | Confidence | Source |
|---|---|---|---|---|---|
| Integrator | - HPE-built | Hewlett Packard Enterprise | - | Verified | top500.orgnextplatform.com |
| Accelerator | NVIDIA H200 SXM Accelerators CUDA (Hopper GH100) · 16,896C · 1.98 GHz · TSMC 4N · 700 W NVIDIA H200 SXM5 141GB | NVIDIA | - | Verified | top500.orgnextplatform.com |
| CPU | Intel Xeon Platinum 8558 CPUs x86-64 · 48C · 2.1 GHz · Intel 7 Xeon Platinum 8558 48C 2.1GHz | Intel | - | Reported | top500.org |
| Interconnect | NVIDIA InfiniBand NDR (Quantum-2) Interconnect Fat tree or dragonfly+ · 400 Gb/s per port · Under 0.6 microseconds Infiniband NDR200 | NVIDIA | - | Reported | top500.org |
Engineering, funding and access
What ABCI 3.0 runs on, who paid for it and how people get time on it. Each line carries who said it and when.
Hardware
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Compute nodes | 766 nodesHPE Cray XD670 nodes with 8 NVIDIA H200 each, 6128 GPUs in total | 2025 | Operator stated | abci.aidocs.abci.ai |
| Total memory | 1,532 TBABCI states 2 TB DDR5 per node, multiplied here by 766 nodes; excludes GPU HBM | 2025 | Operator stated | abci.ai |
| Storage capacity | 75 PBAll-flash (three DDN ES400NVX2 systems), Lustre plus S3-compatible object storage | 2025 | Operator stated | abci.ai |
| Interconnect and topology | InfiniBand NDR200: 8 x 200 Gb/s per compute node, three-tier fat-tree with full bisection bandwidth; HDR 200 Gb/s per node to storage; SINET6 at 400 Gb/s | 2025 | Operator stated | abci.aiarxiv.org |
| Cooling design | Hot-aisle fan coil units stacked on the racks; 5.2 MW cooling capacityRack fan coil design per the Monoist report; capacity per the arXiv paper | 2025-01 | Press report | monoist.itmedia.co.jparxiv.org |
Software
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Parallel filesystem | Lustre: /home 10 PB, /groups 63 PB, plus 1 PB S3-compatible object store; about 75 PB effective | 2026 | Operator stated | docs.abci.ai |
| Job scheduler | Altair PBS Professional 2022.1.6Resource types rt_HF (8 GPUs), rt_HG (1 GPU), rt_HC (CPU only) | 2026 | Operator stated | docs.abci.aiarxiv.org |
| Programming and software stack | Rocky Linux 9.4 on interactive nodes and Red Hat Enterprise Linux 9.4 on compute nodes | 2026 | Operator stated | docs.abci.ai |
| Programming and software stack | NVIDIA CUDA Toolkit and HPC SDK, GCC, Intel oneAPI, Intel MPI and HPC-X, SingularityCE containers, Open OnDemand | 2026 | Operator stated | docs.abci.aiarxiv.org |
Funding
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Funded by | Ministry of Economy, Trade and Industry (METI), JapanOECD.AI dashboard attributes funding to METI Economic Security Fund | 2025-01 | Press report | oecd.ai |
| Funding programme | METI Economic Security Fund | 2025-01 | Press report | oecd.ai |
| Stated cost | 232 USD mStated as an initial investment of 36 billion yen (about 232 million USD) | 2025-01 | Press report | oecd.ai |
| Procurement | HPE selected as integrator in July 2024, replacing Fujitsu and NEC who built earlier ABCI generations | 2024-07 | Press report | nextplatform.com |
Access
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| How researchers get time | General provision of ABCI 3.0 to researchers, industry and the LLM building support program, via AIST | 2025-01 | Press report | monoist.itmedia.co.jp |
| Access page | abci.ai | 2025 | Operator stated | abci.ai |
AI datacenter metrics
Figures beyond an accelerator count, each with who stated it. What can and cannot be compared across AI datacenters.
| Metric | Value | As of | Basis | Note | Source |
|---|---|---|---|---|---|
| Accelerators | 6,128 accelerators | 2025-06 | Operator stated | 766 compute nodes with 8 NVIDIA H200 each, per AIST documentation. | docs.abci.aiunit.aist.go.jp |
| Facility power | 6 MW | 2024-11 | Operator stated | Electrical capacity of the AIST AI data centre after the ABCI 3.0 upgrade (5.2 MW cooling, 144 racks). Facility figure from the ABCI 3.0 paper. | arxiv.org |
| PUE | 1.15 | 2025-06 | Operator stated | AIST states PUE '< 1.15' as of June 2025 (32 C water cooled by a cooling tower). Value is the stated upper bound. | unit.aist.go.jp |
The read
AIST's third physical ABCI generation, not an upgrade of the machine already in this dataset: HPE replaced the NEC and Fujitsu integrators that built ABCI 1.0 and 2.0, on Xeon Platinum hosts paired with NVIDIA H200. The original `abci` row (1.0, 2018, Fujitsu-built, Tesla V100) is a genuinely different, still-correctly-recorded machine, not an outdated figure for this one.
Timeline
- 2024-07 Announced source
- 2024-07 AIST selected HPE and NVIDIA to build ABCI 3.0, replacing the Fujitsu and NEC integrators of earlier generations source
- 2024-11 ABCI 3.0 began gradual rollout to users source
- 2025-01-24 AIST announced the start of general provision of ABCI 3.0 source
- 2025-06 Listed at #65 on the Green500 (June 2025) source
- 2025-06 First operational source
Public list appearances
Pointers only: rank and edition, linking to the canonical entry. We do not reproduce list tables. See sourcing policy.
Site & facility
ABCI Data Center, Kashiwa
- Location
- Kashiwa, Japan
- Cooling
- Direct liquid cooling with hot-water loop
- PUE
- 1.1
- Commissioned
- 2018
Where sources disagree
We record conflicts instead of picking a winner quietly. All open questions.
- First operational date: 2025-06 as recorded against General provision from 2025-01-24. OECD.AI also says fully operational in January 2025 and the arXiv paper describes a rollout from November 2024.
Change history
- 2026-10-04 Added AI datacenter metrics for abci-3
- 2026-09-22 Gained a Green500 rank pointer (#65 on the 2025-06 list)
Nearby in scale
The machines closest to ABCI 3.0 by Rmax, smaller to larger.
- MareNostrum 5 ACC · Spain, operational · 138.2 PFlop/s
- NIPA(NHN Cloud)-CL-1 · South Korea, operational · 137.4 PFlop/s
- CHIE-4 · Japan, operational · 135.4 PFlop/s
- Summit · USA, decommissioned · 148.6 PFlop/s
- Maximus-02 · USA, operational · 156.1 PFlop/s
- Discovery 6 · USA, operational · 164.2 PFlop/s
Related systems
Same site
- ABCI-Q · Japan, operational, 2025
- ABCI 2.0 · Japan, operational, 2021
- ABCI · Japan, decommissioned, 2018
Same operator
- AIST AI Cloud · Japan, operational, 2017
- Blue Protein · Japan, operational, 2005
- AIST Super Cluster P-32 · Japan, operational, 2004
Same accelerator
- AI-Farabium · Kazakhstan, operational, 2025
- Alem.Cloud · Kazakhstan, operational, 2025
- AzInTelecom Supercomputer Center · Azerbaijan, operational
- Cannon2-H200 · USA, operational, 2025
- davinci-2 · Italy, operational, 2025
- FPT AI Factory Japan · Japan, operational, 2025
Source check
We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.
| Cited source | Result | Found on the page |
|---|---|---|
| top500.org | names system and part | NVIDIA H200 SXM, Intel Xeon Platinum 8558, NVIDIA InfiniBand NDR (Quantum-2) |
| nextplatform.com | names system and part | NVIDIA H200 SXM, Intel Xeon Platinum 8558, NVIDIA InfiniBand NDR (Quantum-2) |
Checked 2026-10-18 by pnpm verify. Re-run it and the table changes with the web.
Further reading
Inside a node
Why accelerators exist, what the memory hierarchy costs, and how the CPU and accelerator merged onto one package.
The interconnect
Topologies, why latency and tail behaviour matter more than bandwidth, and how the fabric market consolidated.
Operating a supercomputer
Acceptance testing, why "installed" and "in production" are six months apart, and the machine lifecycle.