Supercomputers/Systems/Stargate Project Jupiter (New Mexico)
USA · under construction · ai training
Stargate Project Jupiter (New Mexico)
Also known as OpenAI Stargate Doña Ana County
Operated by Oracle at Santa Teresa Project Jupiter Campus .
Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1,350 of 1,581 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.
Measured performance
- Rmax
- -
- Rpeak
- -
- Rmax ÷ Rpeak
- -
- Cores
- -
- Power
- -
- Per watt
- - GF/W
Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.
What this machine is made of
One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.
| Role | Part | Supplier at build | Quantity | Confidence | Source |
|---|---|---|---|---|---|
| Integrator | - BorderPlex Digital Assets develops the four-building, 1,400-acre campus | BorderPlex Digital Assets | - | Reported | elpasomatters.orgabqjournal.com |
| Integrator | - STACK Infrastructure co-develops the campus | STACK Infrastructure | - | Reported | elpasomatters.orgabqjournal.com |
Engineering, funding and access
What Stargate Project Jupiter (New Mexico) runs on, who paid for it and how people get time on it. Each line carries who said it and when.
Hardware
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Cooling design | Closed-loop pipe system with a one-time fill then recycled water; average use about 20,000 gallons per day capped at 60,000 | 2025-09 | Press report | elpasomatters.orgabqjournal.com |
Funding
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Stated cost | 165,000 USD mMaximum investment over 30 years covered by a USD 165 billion industrial revenue bond; El Paso Matters gives an initial USD 50 billion over five years | 2025-09 | Press report | elpasomatters.orgabqjournal.com |
| Procurement | BorderPlex Digital Assets and STACK Infrastructure develop four data centers; Oracle Cloud Infrastructure leases them for 18 years with OpenAI as primary customer | 2025-09 | Press report | elpasomatters.orgabqjournal.com |
AI datacenter metrics
Figures beyond an accelerator count, each with who stated it. What can and cannot be compared across AI datacenters.
| Metric | Value | As of | Basis | Note | Source |
|---|---|---|---|---|---|
| Stated investment | 50 USD bn | 2025-09 | Design target | El Paso Matters: developers plan $50 bn over five years at Santa Teresa; up to $165 bn over 30 years incl. equipment refresh cycles | elpasomatters.org |
How it is powered
| Source | Provider | MW | Status | As of | Basis | Note | Source link |
|---|---|---|---|---|---|---|---|
| Fuel cells | Bloom Energy | 2,450 | planned | 2026-04 | Operator stated | Up to 2.45 GW installed Bloom fuel cells in one microgrid, replacing the earlier plan of 700 to 900 MW of gas turbines and diesel. Fuel not stated by Oracle. | oracle.comelpasomatters.org |
How AI campuses are powered: capacities are what the operator, utility or filing states, not what has been delivered.
The read
Project Jupiter, a four-building hyperscale AI training campus on 1,400 acres at Santa Teresa in Dona Ana County, New Mexico, developed by BorderPlex Digital Assets and STACK Infrastructure and leased by Oracle Cloud Infrastructure for 18 years with OpenAI as the primary customer, as part of the Stargate program. El Paso Matters reports a standalone microgrid of 700 to 900 MW using natural-gas turbines rather than the El Paso Electric grid and a closed-loop cooling system, and the Albuquerque Journal gives the developers, the Oracle lease and an end-of-2026 operational estimate. Epoch AI's data-center directory (June 2026 status: earthworks and structural work underway) gives a much larger 1.75 GW IT power projection and Bloom fuel-cell power, so published capacity figures differ widely by source. No accelerator type or count has been published, and power is blank because the capacity is a planned design figure.
Timeline
Site & facility
Santa Teresa Project Jupiter Campus
- Location
- Santa Teresa, NM, USA
- Cooling
- Closed-loop water cooling
Change history
- 2026-10-01 Added Stargate Project Jupiter (New Mexico)
Related systems
Same operator
- Oracle Abu Dhabi OCI Supercluster · United Arab Emirates, under construction
- Stargate Abilene · USA, operational, 2025
- Stargate Port Washington (Lighthouse) · USA, under construction
- Stargate Shackelford County (Frontier) · USA, under construction
- Stargate Michigan (Saline Township) · USA, under construction
Source check
We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.
| Cited source | Result | Found on the page |
|---|---|---|
| elpasomatters.org | names system only | - |
| abqjournal.com | names system only | - |
Checked 2026-10-18 by pnpm verify. Re-run it and the table changes with the web.