COMPUTE ATLAS Supercomputer supply-chain graph
1153 systems 482 sites Sourced data

Supercomputers/Systems/Stargate Project Jupiter (New Mexico)

USA · under construction · ai training

Stargate Project Jupiter (New Mexico)

Also known as OpenAI Stargate Doña Ana County

Operated by Oracle at Santa Teresa Project Jupiter Campus .

Phase 1 seed dataset, compiled by hand. These rows were built from public operator, laboratory and vendor sources. A mechanical second-reader pass has since fetched every cited source: 1092 of 1153 systems have a readable citation that names them, and 40 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.

Measured performance

Rmax
-
Rpeak
-
Rmax ÷ Rpeak
-
Cores
-
Power
-
Per watt
- GF/W

Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.

What this machine is made of

One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.

Role Part Supplier at build Quantity Confidence Source
Integrator -
BorderPlex Digital Assets develops the four-building, 1,400-acre campus
BorderPlex Digital Assets
- Reported elpasomatters.orgabqjournal.com
Integrator -
STACK Infrastructure co-develops the campus
STACK Infrastructure
- Reported elpasomatters.orgabqjournal.com

AI datacenter metrics

Figures beyond an accelerator count, each with who stated it. What can and cannot be compared across AI datacenters.

MetricValueAs ofBasisNoteSource
Stated investment 50 USD bn 2025-09 Design target El Paso Matters: developers plan $50 bn over five years at Santa Teresa; up to $165 bn over 30 years incl. equipment refresh cycles elpasomatters.org

How it is powered

SourceProviderMWStatusAs ofBasisNoteSource link
Fuel cells Bloom Energy 2,450 planned 2026-04 Operator stated Up to 2.45 GW installed Bloom fuel cells in one microgrid, replacing the earlier plan of 700 to 900 MW of gas turbines and diesel. Fuel not stated by Oracle. oracle.comelpasomatters.org

How AI campuses are powered: capacities are what the operator, utility or filing states, not what has been delivered.

The read

Project Jupiter, a four-building hyperscale AI training campus on 1,400 acres at Santa Teresa in Dona Ana County, New Mexico, developed by BorderPlex Digital Assets and STACK Infrastructure and leased by Oracle Cloud Infrastructure for 18 years with OpenAI as the primary customer, as part of the Stargate program. El Paso Matters reports a standalone microgrid of 700 to 900 MW using natural-gas turbines rather than the El Paso Electric grid and a closed-loop cooling system, and the Albuquerque Journal gives the developers, the Oracle lease and an end-of-2026 operational estimate. Epoch AI's data-center directory (June 2026 status: earthworks and structural work underway) gives a much larger 1.75 GW IT power projection and Bloom fuel-cell power, so published capacity figures differ widely by source. No accelerator type or count has been published, and power is blank because the capacity is a planned design figure.

Timeline

Site & facility

Santa Teresa Project Jupiter Campus

Location
Santa Teresa, NM, USA
Cooling
Closed-loop water cooling

Change history

Source check

We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.

Cited sourceResultFound on the page
elpasomatters.orgnames system only-
abqjournal.comnames system only-

Checked 2026-10-09 by pnpm verify. Re-run it and the table changes with the web.