South Korea · under construction · ai training

SK Ulsan AI Data Center

Also known as SK Telecom AWS Ulsan AI data center; Ulsan AIDC

Operated by SK Telecom at SK Ulsan AI Data Center Site .

Phase 1 seed dataset, compiled by hand. These rows were built from public operator, laboratory and vendor sources. A mechanical second-reader pass has since fetched every cited source: 1092 of 1153 systems have a readable citation that names them, and 40 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.

Measured performance

Rmax
-
Rpeak
-
Rmax ÷ Rpeak
-
Cores
-
Power
-
Per watt
- GF/W

Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.

What this machine is made of

One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.

Role Part Supplier at build Quantity Confidence Source
Integrator -
SK Telecom and SK Ecoplant build the Ulsan AI data center; SK Broadband and SK Gas support
SK Telecom - Reported investkorea.orgkoreaherald.com
Integrator -
AWS is the technical partner; the facility incorporates AWS technical requirements
Amazon - Reported investkorea.orglightreading.com

AI datacenter metrics

Figures beyond an accelerator count, each with who stated it. What can and cannot be compared across AI datacenters.

MetricValueAs ofBasisNoteSource
Accelerators 60,000 accelerators 2025-08 Design target Planned GPU count at full build-out per Light Reading; vendor not named. lightreading.com
Facility power 40 MW 2027-11 Design target Phase 1 of the Ulsan site, completion Nov 2027 per Light Reading; full 100 MW by Feb 2029 (live row covers 100 MW). lightreading.com
Facility power 100 MW 2025-08 Design target 100 MW at full build-out (40 MW by November 2027, full by February 2029); IT versus facility load not stated. lightreading.comthetechcapital.com

Compute deals

All compute deals. Headline values are as announced, not additive.

The read

A GPU-dedicated AI data center that SK Telecom, SK Ecoplant and Amazon Web Services broke ground on in Ulsan in late August 2025 (Invest Korea dates it 1 September, Light Reading and The Tech Capital say August), described as Korea's largest AI facility outside the Seoul area. Light Reading reports a 100 MW facility with 60,000 GPUs, and The Tech Capital reports 40 MW in 2027 scaling to 100 MW; Light Reading gives the phases as 40 MW by November 2027 and full capacity by February 2029. The Korea Herald adds 20 to 40 kW racks with hybrid cooling capable of 40 to 100 kW per rack. No GPU vendor is named on the fetched pages, the Invest Korea page gives no figures, and the figures come from trade press, so the tier is reported.

Timeline

Site & facility

SK Ulsan AI Data Center Site

Location
Ulsan, South Korea
Cooling
Hybrid air and water cooling

Change history

Source check

We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.

Cited sourceResultFound on the page
investkorea.orgnames system only-
lightreading.comnames system only-

Checked 2026-10-09 by pnpm verify. Re-run it and the table changes with the web.

Further reading