Supercomputers/Systems/SK Ulsan AI Data Center
South Korea · under construction · ai training
SK Ulsan AI Data Center
Also known as SK Telecom AWS Ulsan AI data center; Ulsan AIDC
Operated by SK Telecom at SK Ulsan AI Data Center Site .
Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1,350 of 1,581 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.
Measured performance
- Rmax
- -
- Rpeak
- -
- Rmax ÷ Rpeak
- -
- Cores
- -
- Power
- -
- Per watt
- - GF/W
Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.
What this machine is made of
One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.
| Role | Part | Supplier at build | Quantity | Confidence | Source |
|---|---|---|---|---|---|
| Integrator | - SK Telecom and SK Ecoplant build the Ulsan AI data center; SK Broadband and SK Gas support | SK Telecom | - | Reported | investkorea.orgkoreaherald.com |
| Integrator | - AWS is the technical partner; the facility incorporates AWS technical requirements | Amazon | - | Reported | investkorea.orglightreading.com |
Engineering, funding and access
What SK Ulsan AI Data Center runs on, who paid for it and how people get time on it. Each line carries who said it and when.
Hardware
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Cooling design | Site chosen for proximity to SK Gas's LNG power plant, which supplies electricity and LNG cold energy for coolingReported rationale, not a confirmed design. | 2025-06-16 | Press report | lightreading.com |
Funding
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Funded by | SK Telecom plans KRW 3.4 trillion (about $2.5 billion) on AI infrastructure over three years with the largest share expected for this project; AWS has committed KRW 7.85 trillion (about $5.8 billion) to Korean cloud infrastructure by 2027The project's own cost is undisclosed. | 2025-06-16 | Press report | lightreading.com |
| Procurement | AWS and SK Group AI data center managed by SK Telecom: 40 MW first phase by November 2027 and 100 MW by February 2029 with 60,000 GPUs, on a 36,000 square metre plotLight Reading, citing Yonhap; AWS and SK did not publish these figures in the pages we fetched. | 2025-06-16 | Press report | lightreading.com |
AI datacenter metrics
Figures beyond an accelerator count, each with who stated it. What can and cannot be compared across AI datacenters.
| Metric | Value | As of | Basis | Note | Source |
|---|---|---|---|---|---|
| Accelerators | 60,000 accelerators | 2025-08 | Design target | Planned GPU count at full build-out per Light Reading; vendor not named. | lightreading.com |
| Facility power | 40 MW | 2027-11 | Design target | Phase 1 of the Ulsan site, completion Nov 2027 per Light Reading; full 100 MW by Feb 2029 (live row covers 100 MW). | lightreading.com |
| Facility power | 100 MW | 2025-08 | Design target | 100 MW at full build-out (40 MW by November 2027, full by February 2029); IT versus facility load not stated. | lightreading.comthetechcapital.com |
Compute deals
- 2025-06-20: Amazon and SK Telecom (joint venture , 100 MW). lightreading.comtechblog.comsoc.org
All compute deals. Headline values are as announced, not additive.
The read
A GPU-dedicated AI data center that SK Telecom, SK Ecoplant and Amazon Web Services broke ground on in Ulsan in late August 2025 (Invest Korea dates it 1 September, Light Reading and The Tech Capital say August), described as Korea's largest AI facility outside the Seoul area. Light Reading reports a 100 MW facility with 60,000 GPUs, and The Tech Capital reports 40 MW in 2027 scaling to 100 MW; Light Reading gives the phases as 40 MW by November 2027 and full capacity by February 2029. The Korea Herald adds 20 to 40 kW racks with hybrid cooling capable of 40 to 100 kW per rack. No GPU vendor is named on the fetched pages, the Invest Korea page gives no figures, and the figures come from trade press, so the tier is reported.
Timeline
- 2025-06 Announced source
Site & facility
SK Ulsan AI Data Center Site
- Location
- Ulsan, South Korea
- Cooling
- Hybrid air and water cooling
Change history
- 2026-10-04 Added SK Ulsan AI Data Center (SK Telecom)
Nearby in scale
The machines closest to SK Ulsan AI Data Center by accelerator count, smaller to larger.
- TELUS BC Sovereign AI Cluster · Canada, under construction · 60,000 accelerators
- Nebius Mäntsälä Cluster · Finland, operational · 60,000 accelerators
- Samsung AI Megafactory · South Korea, planned · 50,000 accelerators
- Galaxy Helios (CoreWeave) · USA, operational · 63,151 accelerators
- Aurora · USA, operational · 63,744 accelerators
- Meta Cheyenne (Wyoming) · USA, operational · 68,400 accelerators
Related systems
Same operator
- Haein Cluster · South Korea, operational, 2025
- SK Telecom Titan · South Korea, operational, 2022
Source check
We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.
| Cited source | Result | Found on the page |
|---|---|---|
| investkorea.org | names system only | - |
| lightreading.com | names system only | - |
Checked 2026-10-18 by pnpm verify. Re-run it and the table changes with the web.