Three ratios fall out of the figures recorded for AI datacenters. Where an investment and a power figure are both stated, the median is $0.0 billion per megawatt across 31 campuses. Where IT power and an accelerator count are both recorded, the median is 2.0 kW of IT load per accelerator across 24 systems. And 81 running AI systems have both an announcement and a first-operation date, with a median of 2 months between them. All three are indicative: the numerator and denominator often cover different scopes, and the sample is the campuses that publish numbers.

Investment per megawatt

SystemOperatorStated investment ($bn)Power (MW)Power figure$bn per MW
xAI Colossus xAI 12.9 150 Facility 0.1
xAI Atlanta xAI 0.7 17 IT load 0.0
Microsoft Goodyear AI Datacenter Microsoft 7.7 202 IT load 0.0
AWS Madison Mega Site (Canton) Amazon 10.8 284 IT load 0.0
Google Council Bluffs East TPU Campus Alphabet 9 237 IT load 0.0
Google Columbus TPU Campus Alphabet 11.5 303 IT load 0.0
Microsoft Project Osmium Microsoft 7.2 190 IT load 0.0
Google New Albany TPU Campus Alphabet 12.6 333 IT load 0.0
Google Pryor North TPU Campus Alphabet 13.9 368 IT load 0.0
AWS Ridgeland Campus Amazon 8.6 228 IT load 0.0
Omnia Pecem (TikTok) Omnia Data Centers 9.8 300 Facility 0.0
Meta Prometheus Meta Platforms 17.8 612 Facility 0.0
Microsoft Fairwater (Atlanta) Microsoft 24.1 859 Facility 0.0
Denton (CoreWeave) CoreWeave 9.9 367 Facility 0.0
Stargate Abilene Oracle 15 590 Facility 0.0
Galaxy Helios (CoreWeave) CoreWeave 5 200 Facility 0.0
Meta Hyperion Meta Platforms 50 2,260 Facility 0.0
Stargate Shackelford County (Frontier) Oracle 25 1,400 Facility 0.0
Stargate Michigan (Saline Township) Oracle 16 1,000 Facility 0.0
Microsoft Fairwater (Wisconsin) Microsoft 7 442 Facility 0.0
xAI Colossus 2 xAI 20 1,276 Facility 0.0
Stargate Port Washington (Lighthouse) Oracle 15 1,000 Operator claimed 0.0
Meta El Paso (Texas) Meta Platforms 14 1,000 Facility 0.0
Polaris Forge 1 (Ellendale) CoreWeave 2.6 250 IT load 0.0
Project Rainier Amazon 11 1,092 Facility 0.0
Meta Lebanon (Indiana) Meta Platforms 10 1,000 Facility 0.0
Meta Montgomery (Alabama) Meta Platforms 1.5 153 IT load 0.0
Scala AI City Scala Data Centers 0.5 54 IT load 0.0
CoreWeave Kenilworth (NEST) CoreWeave 1.8 250 Facility 0.0
Meta Cheyenne (Wyoming) Meta Platforms 0.8 152 IT load 0.0
Meta Rosemount (Minnesota) Meta Platforms 0.8 178 IT load 0.0

Read with care. A stated investment can cover land, power and several phases, while the power figure may be only the first phase or only the IT load, so ratios far from the median usually mean a scope mismatch, not an unusually cheap or dear campus. Investment includes the accelerators when the operator says it does; where it does not, the ratio understates the cost of a full build.

IT power per accelerator

SystemOperatorIT power (MW)AcceleratorskW per accelerator
Polaris Forge 1 (Ellendale) CoreWeave 250 36,900 6.78
Google Pryor North TPU Campus Alphabet 368 101,400 3.63
Nscale Verne Iceland Cluster Nscale 15 4,600 3.26
Meta Prometheus Meta Platforms 471 166,015 2.84
Denton (CoreWeave) CoreWeave 260 100,000 2.60
Meta Cheyenne (Wyoming) Meta Platforms 152 68,400 2.22
Meta Montgomery (Alabama) Meta Platforms 153 69,100 2.21
Galaxy Helios (CoreWeave) CoreWeave 133 63,151 2.11
Microsoft Fairwater (Wisconsin) Microsoft 369 176,391 2.09
Microsoft Fairwater (Atlanta) Microsoft 636 304,279 2.09
Stargate Abilene Oracle 421 201,600 2.09
Meta Rosemount (Minnesota) Meta Platforms 178 85,400 2.08
xAI Colossus 2 xAI 430 220,000 1.95
Muskogee (CoreWeave) CoreWeave 70 36,000 1.94
Microsoft Project Osmium Microsoft 190 103,200 1.84
Project Rainier Amazon 910 500,000 1.82
Microsoft Goodyear AI Datacenter Microsoft 202 116,400 1.74
xAI Atlanta xAI 17 12,448 1.37
xAI Colossus xAI 130 100,000 1.30
AWS Ridgeland Campus Amazon 228 261,200 0.87
AWS Madison Mega Site (Canton) Amazon 284 326,600 0.87
Google Council Bluffs East TPU Campus Alphabet 237 305,600 0.78
Google Columbus TPU Campus Alphabet 303 465,700 0.65
Google New Albany TPU Campus Alphabet 333 576,400 0.58

An accelerator's own TDP is 0.7 kW for an H100 and well over 1 kW for a Blackwell GPU. The whole-IT figure also counts CPUs, memory, networking and storage, so it runs higher. Pairs are shown only when both figures are of the same kind (both estimates or both stated), and values far above or below the median are worth checking against the source before relying on them.

Announcement to first light

SystemOperatorAnnouncedFirst operationalMonths
AWS Ridgeland Campus Amazon 2024-01 2026-05 28
AWS Madison Mega Site (Canton) Amazon 2024-01 2025-06 17
Cassava AI Factory Cassava Technologies 2025-03 2026-06 15
Industrial AI Cloud Deutsche Telekom 2024-11 2026-02-04 15
Firebird Armenian AI Factory (DC-1) Firebird 2025-06-17 2026-08-08 14
Isambard-AI University of Bristol 2023 2024-07 13
SDS-AI SDS Shonfeld 2024-08 2025-09 13
xAI Atlanta xAI 2024-01-23 2025-02 13
ABCI 3.0 AIST 2024-07 2025-06 11
GroqCloud Dammam Inference Cluster Groq 2024-03 2025-02 11
xAI Colossus 2 xAI 2025-02 2026-01 11
HiPerGator AI University of Florida 2020-07 2021 11
Tokyo-1 Xeureka 2023-03 2024-02 11
Microsoft Fairwater (Wisconsin) Microsoft 2025-09 2026-06 9
IREN Childress Horizons 1-4 (Microsoft) IREN 2025-11-03 2026-08 9
Neocortex PSC 2020 2021-03 9
SINES Data Campus GB300 Deployment Microsoft 2025-10 2026 8
Cerebras Montreal Inference Site (MTL-3) Cerebras 2025-02 2025-10 8
FPT AI Factory Japan FPT Corporation 2024-11 2025 7
NeXXt AI Factory Fastweb 2023-12-13 2024-07-09 7
OpenCanvas GPUaaS SP1 NTT DATA Japan 2025-03-19 2025-10 7
Zenith University of Cambridge 2026-01-26 2026-08 7
BioHive-2 Recursion 2023-11 2024-05 6
TELUS Sovereign AI Factory (Rimouski) TELUS 2025-03-18 2025-09-24 6
Qingdao AI Computing Center Qingdao Laoshan Technology Innovation Group 2022-05 2022-11 6
Cerebras Oklahoma City Cerebras 2025-03 2025-09 6
Eagle Microsoft 2023 2023-11 5
Eos NVIDIA 2023 2023-11 5
NIPA (Kakao) Kakao 2025-08 2026-01 5
PARAM Siddhi-AI C-DAC 2020-06 2020-11 5
Israel-1 NVIDIA 2023-06 2023-11 5
Polaris Forge 1 (Ellendale) CoreWeave 2025-05 2025-10 5
Nebius Kansas City Cluster Nebius 2024-11 2025-04 5
CoreWeave Cambridge (Cohere) CoreWeave 2025-03-20 2025-08 5
Nscale Verne Iceland Cluster Nscale 2025-11 2026-04 5
Nebius Longcross UK Cluster Nebius 2025-06 2025-11 5
Opera Iceland KEF-1 SuperPOD Opera 2024-02 2024 4
LillyPod Eli Lilly 2025-10 2026-02 4
SEIRAN Tokyo University of Technology 2025-06-11 2025-10 4
MN-2 Preferred Networks 2019-03-18 2019-07 4
Together AI / Hypertec Cloud GB200 Cluster Together AI 2024-11 2025-01 2
BioHive-1 Recursion 2021-04 2021-06 2
Alem.Cloud Ministry of Digital Development (Kazakhstan) 2025-05-19 2025-07 2
BUZZ AI Cloud (Paraguay) HIVE Digital Technologies 2026-01-13 2026-03-18 2
TensorWave Tucson MI325X Cluster TensorWave 2025-05 2025-07 2
Nebius Vineland (Microsoft) Nebius 2025-09-08 2025-11 2
Christofari Sberbank 2019-11-08 2019-12 1
LRZ Cerebras CS-2 LRZ 2022-05 2022 1
Selene NVIDIA 2020 2020-06 0
Meta GenAI cluster (RoCE) Meta Platforms 2024-03 2024-03 0
Meta GenAI cluster (InfiniBand) Meta Platforms 2024-03 2024-03 0
MAXIMUS-384 Core42 2025-11 2025-11 0
CHIE-2 SoftBank Corp. 2024-10 2024-10 0
CHIE-4 SoftBank Corp. 2025-07 2025-07 0
Condor Galaxy 1 Cerebras 2023-07 2023-07 0
Cerebras Andromeda Cerebras 2022-11 2022-11 0
CoreWeave AI cluster for Inflection AI CoreWeave 2023-06 2023-06 0
ASPIRE 2A+ National Supercomputing Centre Singapore 2024-10 2024-10 0
Roche AI Factory Roche 2026-03 2026-03 0
Vultr AMD GPU Supercompute Cluster (Chicago) Vultr 2024-12 2024-12 0
Sesterce Marseille SuperComputer Sesterce 2024-11 2024-11 0
Fuyao XPeng Motors 2022-08 2022-08 0
Mana Oasis Haomo.AI 2023-01-05 2023-01-05 0
Haein Cluster SK Telecom 2025-08 2025-08-05 0
Mayo Clinic DGX SuperPOD Mayo Clinic 2025-07 2025-07 0
Naver B200 4K Cluster Naver 2026-01 2026-01 0
SenseTime AIDC (Lingang) SenseTime 2022-01 2022-01 0
Kempner AI Cluster Kempner Institute 2023 2023 0
Google TPU v4 ML Hub (Oklahoma) Alphabet 2022-05-11 2022-05 0
Zhangbei Intelligent Computing Center Alibaba Group 2022-08-30 2022-08 0
fortytwo hessian.AI 2023-06-15 2023 0
Nabuchodonosor Scaleway 2023-10-05 2023-10 0
China Telecom Shaoguan Zhenwu Cluster China Telecom 2026-04 2026-04 0
du NextGenAI Supercluster du Telecom 2025-10-17 2025-10 0
NEC AI Research Supercomputer NEC 2022-05 2022-05 0
Cannon2-H200 Harvard FAS Research Computing 2025-08 2025-08 0
Nebius Modiin Cluster Nebius 2025-10-20 2025-10 0
HOLL-I NCSA 2022-05 2022-05 0
NVIDIA DGX SuperPOD (V100) NVIDIA 2019 2019-06 0
iFlytek Feixing-1 iFlytek 2023-10 2023-10-24 0
Moore Threads KUAE 1,000-GPU Cluster Moore Threads 2023-12 2023-12-19 0

This compares like with like only loosely: an announcement may be a plan, a contract or a groundbreaking, and "first operational" may be a first hall of many. For the same measurement on supercomputers, see announcement to first light.