Supercomputers/Sites/Start Campus SINES Data Campus (SIN01)
Sines · Portugal
Start Campus SINES Data Campus (SIN01)
Operated by Start Campus. Hosting 1 system in this dataset, 1 of them currently operational.
- Systems hosted
- 1
- Installed Rmax
- 0.0 GFlop/s
- Recorded power
- 0 kW
- Cooling
- -
Facility facts
Power, cooling and efficiency figures for Start Campus SINES Data Campus (SIN01), each with its own source and date.
| Fact | Value | As of | Basis | Source |
|---|---|---|---|---|
| Facility power | 1,200 MW Campus fully permitted for 1.2 GW; the second building is 200 MW. | 2026-05-05 | Operator stated | nscale.com |
| PUE | 1.1 Design target, not measured. | 2026-05-05 | Operator stated | nscale.com |
| WUE | 0 L/kWh Design target. | 2026-05-05 | Operator stated | nscale.com |
| Renewable share of supply | 100 percent | 2026-05-05 | Operator stated | nscale.com |
| Cooling | Liquid cooling with ocean water as the intended heat sink | 2026-05-05 | Operator stated | nscale.com |
Systems at this site
| System | Rmax | Power | First operational | Status |
|---|---|---|---|---|
| SINES Data Campus GB300 Deployment | - | - | 2026 | operational |
Facility fields are recorded only where a public source states them. Blank means we have not found one, not that the value is zero: an important distinction if you are aggregating power or PUE across sites.