Supercomputers/Sites/Microsoft Mount Pleasant AI datacenter site

Mount Pleasant, WI · USA

Microsoft Mount Pleasant AI datacenter site

Operated by Microsoft. Hosting 1 system in this dataset, 1 of them currently operational.

Systems hosted
1
Installed Rmax
0.0 GFlop/s
all eras, as reported
Recorded power
0 kW
where disclosed
Cooling
-

Facility facts

Power, cooling and efficiency figures for Microsoft Mount Pleasant AI datacenter site, each with its own source and date.

FactValueAs ofBasisSource
Power supplier We Energies; Microsoft prepays for energy and electrical infrastructure and funds a 250 MW solar project in Portage County to match fossil-sourced kilowatt-hours 2025-09-18 Operator stated blogs.microsoft.com
Cooling Closed-loop liquid cooling for more than 90% of the facility; outside-air cooling for the remainder 2025-09-18 Operator stated blogs.microsoft.com

Systems at this site

SystemRmaxPowerFirst operationalStatus
Microsoft Fairwater (Wisconsin) - - 2026-06 operational

Facility fields are recorded only where a public source states them. Blank means we have not found one, not that the value is zero: an important distinction if you are aggregating power or PUE across sites.