COMPUTE ATLAS Supercomputer supply-chain graph
1581 systems 558 sites Sourced data

Supercomputers/Sites/Meta El Paso AI Campus

El Paso, TX · USA

Meta El Paso AI Campus

Operated by Meta Platforms. Hosting 1 system in this dataset, 0 of them currently operational.

Systems hosted
1
Installed Rmax
0.0 GFlop/s
all eras, as reported
Recorded power
0 kW
where disclosed
Cooling
-

Facility facts

Power, cooling and efficiency figures for Meta El Paso AI Campus, each with its own source and date.

FactValueAs ofBasisSource
Facility power 1,000 MW 1 GW of compute capacity at full build-out. 2026-07-28 Operator stated investor.atmeta.comdatacenters.atmeta.com
Power supplier El Paso Electric, with Meta paying the full cost of energy and adding clean energy to match 100% of the campus electricity use; water from El Paso Water under existing service agreements 2026-03-26 Operator stated datacenters.atmeta.com
Cooling Water-efficient closed-loop liquid-cooled system 2026-03-26 Operator stated datacenters.atmeta.com

Systems at this site

SystemRmaxPowerFirst operationalStatus
Meta El Paso (Texas) - - - under construction

Facility fields are recorded only where a public source states them. Blank means we have not found one, not that the value is zero: an important distinction if you are aggregating power or PUE across sites.