Supercomputers/Sites/Meta El Paso AI Campus
El Paso, TX · USA
Meta El Paso AI Campus
Operated by Meta Platforms. Hosting 1 system in this dataset, 0 of them currently operational.
- Systems hosted
- 1
- Installed Rmax
- 0.0 GFlop/s
- Recorded power
- 0 kW
- Cooling
- -
Facility facts
Power, cooling and efficiency figures for Meta El Paso AI Campus, each with its own source and date.
| Fact | Value | As of | Basis | Source |
|---|---|---|---|---|
| Facility power | 1,000 MW 1 GW of compute capacity at full build-out. | 2026-07-28 | Operator stated | investor.atmeta.comdatacenters.atmeta.com |
| Power supplier | El Paso Electric, with Meta paying the full cost of energy and adding clean energy to match 100% of the campus electricity use; water from El Paso Water under existing service agreements | 2026-03-26 | Operator stated | datacenters.atmeta.com |
| Cooling | Water-efficient closed-loop liquid-cooled system | 2026-03-26 | Operator stated | datacenters.atmeta.com |
Systems at this site
| System | Rmax | Power | First operational | Status |
|---|---|---|---|---|
| Meta El Paso (Texas) | - | - | - | under construction |
Facility fields are recorded only where a public source states them. Blank means we have not found one, not that the value is zero: an important distinction if you are aggregating power or PUE across sites.