Supercomputers/Sites/Eni Green Data Center

Ferrera Erbognone · Italy

Eni Green Data Center

Operated by Eni. Hosting 5 systems in this dataset, 5 of them currently operational.

Systems hosted
5
Installed Rmax
1.10 EFlop/s
all eras, as reported
Recorded power
22.00 MW
where disclosed
Cooling
Direct liquid cooling, warm water

Facility facts

Power, cooling and efficiency figures for Eni Green Data Center, each with its own source and date.

FactValueAs ofBasisSource
Machine-room floor area 5,200 m2 Riello UPS case study: 5,200 m2 of computer systems area in six IT rooms (2,600 m2 in phase 1); building area 45,000 m2. Siemens reference gives about 5,400 m2. Both undated; centre opened 2013. 2013 Vendor stated riello-ups.comassets.new.siemens.com
Facility power 30 MW Final UPS electrical power 30 MW (phase 1 was 7.2 MW); Siemens estimates consumption of 30 MW with peaks to 36 MW. Pre-HPC6 figures. 2013 Vendor stated riello-ups.comassets.new.siemens.com
Cooling Primary cooling by direct outside-air free cooling Riello UPS case study of the Green Data Center; HPC6 later added liquid cooling for the machine itself. 2013 Vendor stated riello-ups.com
PUE 1.2 Both vendors state an annual PUE below 1.2 (an upper bound, recorded as 1.2); design or commissioning claim, not a measured figure for HPC6 era. 2013 Vendor stated riello-ups.comassets.new.siemens.com

Systems at this site

SystemRmaxPowerFirst operationalStatus
HPC7 571.5 PFlop/s 8.73 MW 2026-06 operational
HPC6 477.9 PFlop/s 8.46 MW 2024-11 operational
HPC5 35.45 PFlop/s 2.25 MW 2020 operational
HPC4 12.21 PFlop/s 1.32 MW 2018-01 operational
HPC2 3.19 PFlop/s 1.23 MW 2014 operational

Facility fields are recorded only where a public source states them. Blank means we have not found one, not that the value is zero: an important distinction if you are aggregating power or PUE across sites.