Power distribution, UPS and thermal management for data centers, including liquid cooling distribution units.
From the company's own filings and releases
Second quarter 2026 results
For the quarter ended 30 June 2026 Vertiv reported net sales of $3,274.3 million, up 24.1% from $2,638.1 million a year earlier, of which 17.8% was organic growth. By region, the Americas contributed $2,070.8 million (up 29.2%), Asia Pacific $719.9 million (up 28.5%) and Europe, Middle East and Africa $483.6 million (up 1.7%). Its updated full-year 2026 outlook is net sales of $13.8 billion to $14.2 billion and adjusted diluted EPS of $6.65 to $6.75.
As of 2026-07-29. Source: sec.gov
These statements are the company's own. The tables below come from the parts lists of named systems, a different basis: revenue is reported by region or segment, not by system, so the two cannot be reconciled here.
Systems this company appears in
- Systems
- 2
- Aggregate Rmax
- 241.2 PFlop/s
- Aggregate power
- 22.49 MW
- First appearance
- 2022-11
- Most recent
- 2026-08-08
- Concentration
- 100%
Aggregate Rmax is the sum of the systems this company supplies any part of. It is not revenue and not attributable share: an integrator and a memory vendor in the same machine both count its full FLOPS here. Attribution weighted by role is Phase 4.
Role breakdown
| Role | Systems | Rmax in those systems |
|---|---|---|
| Cooling | 1 | none published |
| Power | 1 | 241.2 PFlop/s |
Appearances
| System | Supplied as | Shipped under | Rmax | Rank |
|---|---|---|---|---|
| Firebird Armenian AI Factory (DC-1) Armenia · 2026-08-08 | Cooling | Vertiv | - | unranked |
| Leonardo Italy · 2022-11 | Power | Vertiv | 241.2 PFlop/s | #18 November 2023 → |
Parts supplied
| Part | Category | Generation | Released |
|---|---|---|---|
| Vertiv Liebert UPS | Power | Liebert | 2015 |
Related news
- Vertiv expands data center kit manufacturing capacity in Slovakia · TechXMediaVertiv is adding roughly 22,000 sq m at its Slovak campus over the next two years for power, switchgear and liquid-cooling equipment, which is the kind of non-accelerator capacity the graph tracks as a possible bottleneck for high-density AI and HPC racks. Regional trade-press coverage of a company announcement, with no investment figure given, so recorded as reported.
- Vertiv to acquire data center fluid management firm King Environmental Services · Data Center DynamicsVertiv's second fluid-management acquisition in under a year, after 2025's PurgeRite deal in North America, extends its cooling-services reach into EMEA -- a sign that liquid-cooling logistics (fluid prep, flushing, load-testing) is consolidating as its own sub-market alongside the hardware itself as GPU rack density rises.
- NVIDIA Launches DSX Ready to Qualify Power and Cooling Products for AI Factories · HPCwireNVIDIA's new DSX Ready program formalizes third-party qualification of power and cooling hardware against its AI-factory reference design, launching with battery storage from Hitachi Energy, LG Energy Solution and Tesla and cooling-distribution units from LG Electronics, LiquidStack and Vertiv -- a sign that the compute supply chain's constraint is shifting from the accelerators themselves toward the power and thermal infrastructure needed to run them at rack scale. Single-sourced to NVIDIA's own announcement (republished by HPCwire), so recorded as reported rather than verified.
- NVIDIA Launches DSX Ready to Qualify Power and Cooling Products for AI Factories · NVIDIA BlogNVIDIA's new DSX Ready program formally qualifies third-party power and cooling hardware against its AI-factory reference design, starting with battery storage (Hitachi Energy, LG Energy Solution, Tesla) and liquid-cooling CDUs (LG Electronics, LiquidStack, Vertiv). It's a structural move: NVIDIA is now gatekeeping which power/cooling vendors count as compatible with its rack designs, which shapes who wins facility-layer contracts downstream of the GPU purchase.