Companies/Schneider Electric
Rueil-Malmaison, France
Schneider Electric
Electrical distribution, switchgear and UPS at facility scale.
Systems this company appears in
- Systems
- 3
- Aggregate Rmax
- none published
- Aggregate power
- 25.00 MW
- First appearance
- 2025-09-12
- Most recent
- 2026-08-08
- Concentration
- -
Aggregate Rmax is the sum of the systems this company supplies any part of. It is not revenue and not attributable share: an integrator and a memory vendor in the same machine both count its full FLOPS here. Attribution weighted by role is Phase 4.
Role breakdown
| Role | Systems | Rmax in those systems |
|---|---|---|
| Power | 3 | none published |
Appearances
| System | Supplied as | Shipped under | Rmax | Rank |
|---|---|---|---|---|
| Firebird Armenian AI Factory (DC-1) Armenia · 2026-08-08 | Power | Schneider Electric | - | unranked |
| USIO Uganda · | Power | Schneider Electric | - | unranked |
| SoftBank Hauts-de-France AI Campus France · | Power | Schneider Electric | - | unranked |
Parts supplied
| Part | Category | Generation | Released |
|---|---|---|---|
| Schneider Galaxy VX UPS | Power | Galaxy | 2016 |
Related news
- Sponsored: Wärtsilä, Schneider Electric, and Stanley Consultants launch coordinated approach for faster US data center power delivery · Data Center DynamicsThree power-delivery vendors announced a bundled 'generator-to-chip' offering -- onsite generation, electrical distribution and engineering under one coordinated contract -- aimed at US AI data centers; no project, site or capacity is named, but it's a vendor-side signal that grid-interconnection delays are pushing power suppliers toward turnkey, pre-integrated delivery rather than developers assembling generation and electrical scope separately.
- Schneider Electric and Equinix trial software-defined switchgear for data centers · Data Center DynamicsEquinix is piloting Schneider Electric's new software-defined medium-voltage switchgear at an undisclosed site, a design Schneider says cuts control wiring, terminals and copper sharply versus engineered-to-order gear. It's a concrete move on the power-delivery-hardware side of the supply chain this graph already tracks alongside NVIDIA's DSX Ready program, aimed at speeding up how fast electrical infrastructure for AI-scale data centers can be built.
- Schneider Electric debuts 2.5MW power modules for AI data centers · Data Center DynamicsSchneider Electric's new prefabricated power modules, sized up to 2.5MW (its largest yet) and built to a reference design co-developed with NVIDIA for the GB300 NVL72 rack, are meant to cut the time to stand up hyperscale power infrastructure from years to months. It's a facility-layer signal that power delivery itself is becoming a standardized, vendor-packaged product as AI data centers scale, which matters to the graph's facility side as much as any accelerator announcement does.