COMPUTE ATLAS Supercomputer supply-chain graph
1540 systems 545 sites Sourced data

Companies/Schneider Electric

Rueil-Malmaison, France

Schneider Electric

Electrical distribution, switchgear and UPS at facility scale.

Systems this company appears in

Systems
3
Aggregate Rmax
none published
systems it appears in
Aggregate power
25.00 MW
where disclosed
First appearance
2025-09-12
Most recent
2026-08-08
Concentration
-
largest is Firebird Armenian AI Factory (DC-1)

Aggregate Rmax is the sum of the systems this company supplies any part of. It is not revenue and not attributable share: an integrator and a memory vendor in the same machine both count its full FLOPS here. Attribution weighted by role is Phase 4.

Role breakdown

Role Systems Rmax in those systems
Power 3 none published

Appearances

System Supplied as Shipped under Rmax Rank
Firebird Armenian AI Factory (DC-1)
Armenia · 2026-08-08
Power Schneider Electric - unranked
USIO
Uganda ·
Power Schneider Electric - unranked
SoftBank Hauts-de-France AI Campus
France ·
Power Schneider Electric - unranked

Parts supplied

Part Category Generation Released
Schneider Galaxy VX UPS Power Galaxy 2016

Related news

  • Sponsored: Wärtsilä, Schneider Electric, and Stanley Consultants launch coordinated approach for faster US data center power delivery · Data Center Dynamics
    Three power-delivery vendors announced a bundled 'generator-to-chip' offering -- onsite generation, electrical distribution and engineering under one coordinated contract -- aimed at US AI data centers; no project, site or capacity is named, but it's a vendor-side signal that grid-interconnection delays are pushing power suppliers toward turnkey, pre-integrated delivery rather than developers assembling generation and electrical scope separately.
  • Schneider Electric and Equinix trial software-defined switchgear for data centers · Data Center Dynamics
    Equinix is piloting Schneider Electric's new software-defined medium-voltage switchgear at an undisclosed site, a design Schneider says cuts control wiring, terminals and copper sharply versus engineered-to-order gear. It's a concrete move on the power-delivery-hardware side of the supply chain this graph already tracks alongside NVIDIA's DSX Ready program, aimed at speeding up how fast electrical infrastructure for AI-scale data centers can be built.
  • Schneider Electric debuts 2.5MW power modules for AI data centers · Data Center Dynamics
    Schneider Electric's new prefabricated power modules, sized up to 2.5MW (its largest yet) and built to a reference design co-developed with NVIDIA for the GB300 NVL72 rack, are meant to cut the time to stand up hyperscale power infrastructure from years to months. It's a facility-layer signal that power delivery itself is becoming a standardized, vendor-packaged product as AI data centers scale, which matters to the graph's facility side as much as any accelerator announcement does.