Supercomputers/Sites/TACC Horizon data center (Round Rock)
Round Rock, TX · USA
TACC Horizon data center (Round Rock)
Operated by Texas Advanced Computing Center. Hosting 1 system in this dataset, 0 of them currently operational.
- Systems hosted
- 1
- Installed Rmax
- 0.0 GFlop/s
- Recorded power
- 0 kW
- Cooling
- -
Facility facts
Power, cooling and efficiency figures for TACC Horizon data center (Round Rock), each with its own source and date.
| Fact | Value | As of | Basis | Source |
|---|---|---|---|---|
| IT power | 13 MW TACC's estimate for Horizon's draw, about double Frontera's 6 MW | 2026-08 | Operator stated | mug.mvapich.cse.ohio-state.edu |
| Cooling | Liquid-cooled hall built to TACC's specifications for up to 250 kW per cabinet, with underfloor cooling pipework installed in September 2025 and a raised floor in October 2025 The Daily Texan quotes Sabey saying Building A was designed for liquid cooling; TACC's slides cite the City of Round Rock finding that the whole Sabey campus uses the water of 14 average households | 2026-08 | Operator stated | mug.mvapich.cse.ohio-state.eduthedailytexan.com |
Systems at this site
| System | Rmax | Power | First operational | Status |
|---|---|---|---|---|
| Horizon | - | - | - | under construction |
Facility fields are recorded only where a public source states them. Blank means we have not found one, not that the value is zero: an important distinction if you are aggregating power or PUE across sites.