Supercomputers/Sites/Pawsey Supercomputing Research Centre
Kensington · Australia
Pawsey Supercomputing Research Centre
Operated by Pawsey Supercomputing Research Centre. Hosting 5 systems in this dataset, 3 of them currently operational.
- Systems hosted
- 5
- Installed Rmax
- 28.45 PFlop/s
- Recorded power
- 1.17 MW
- Cooling
- -
Facility facts
Power, cooling and efficiency figures for Pawsey Supercomputing Research Centre, each with its own source and date.
| Fact | Value | As of | Basis | Source |
|---|---|---|---|---|
| Machine-room floor area | 1,000 m2 Pawsey page says the purpose-built supercomputing building is more than 1000 m2; it also cites 140 kW of on-site solar and groundwater cooling via an aquifer 140 m below (CSIRO's 2013 release says about 100 m). | 2026 | Operator stated | pawsey.org.au |
| Cooling | Groundwater cooling: water pumped from a shallow aquifer about 100 m deep through a heat exchanger and reinjected, with zero net groundwater use CSIRO release of 2013-02-25 estimates saving about 38.5 million litres of water a year versus conventional cooling towers. | 2013-02 | Operator stated | csiro.au |
Systems at this site
| System | Rmax | Power | First operational | Status |
|---|---|---|---|---|
| Setonix | 27.16 PFlop/s | 476.63 kW | 2022 | operational |
| Garrawarla | - | - | 2020-08 | operational |
| Topaz | - | - | 2020-03 | decommissioned |
| Magnus | 1.10 PFlop/s | 697.5 kW | 2014 | decommissioned |
| Galaxy | 192.10 TFlop/s | - | 2013-06 | operational |
Facility fields are recorded only where a public source states them. Blank means we have not found one, not that the value is zero: an important distinction if you are aggregating power or PUE across sites.