COMPUTE ATLAS Supercomputer supply-chain graph
1581 systems 558 sites Sourced data

Supercomputers/Sites/Pawsey Supercomputing Research Centre

Kensington · Australia

Pawsey Supercomputing Research Centre

Operated by Pawsey Supercomputing Research Centre. Hosting 5 systems in this dataset, 3 of them currently operational.

Systems hosted
5
Installed Rmax
28.45 PFlop/s
all eras, as reported
Recorded power
1.17 MW
where disclosed
Cooling
-

Facility facts

Power, cooling and efficiency figures for Pawsey Supercomputing Research Centre, each with its own source and date.

FactValueAs ofBasisSource
Machine-room floor area 1,000 m2 Pawsey page says the purpose-built supercomputing building is more than 1000 m2; it also cites 140 kW of on-site solar and groundwater cooling via an aquifer 140 m below (CSIRO's 2013 release says about 100 m). 2026 Operator stated pawsey.org.au
Cooling Groundwater cooling: water pumped from a shallow aquifer about 100 m deep through a heat exchanger and reinjected, with zero net groundwater use CSIRO release of 2013-02-25 estimates saving about 38.5 million litres of water a year versus conventional cooling towers. 2013-02 Operator stated csiro.au

Systems at this site

SystemRmaxPowerFirst operationalStatus
Setonix 27.16 PFlop/s 476.63 kW 2022 operational
Garrawarla - - 2020-08 operational
Topaz - - 2020-03 decommissioned
Magnus 1.10 PFlop/s 697.5 kW 2014 decommissioned
Galaxy 192.10 TFlop/s - 2013-06 operational

Facility fields are recorded only where a public source states them. Blank means we have not found one, not that the value is zero: an important distinction if you are aggregating power or PUE across sites.