Supercomputers/Sites/TotalEnergies CSTJF (Pau)
Pau · France
TotalEnergies CSTJF (Pau)
Operated by TotalEnergies. Hosting 5 systems in this dataset, 4 of them currently operational.
- Systems hosted
- 5
- Installed Rmax
- 23.25 PFlop/s
- Recorded power
- 5.96 MW
- Cooling
- -
Facility facts
Power, cooling and efficiency figures for TotalEnergies CSTJF (Pau), each with its own source and date.
| Fact | Value | As of | Basis | Source |
|---|---|---|---|---|
| Heat reuse | Residual heat from the Pangea 5 supercomputer is planned to help heat the CSTJF buildings Planned for Pangea 5 (contract signed May 2026, commissioning 2027); the page also states Pangea 5 cooling consumption is expected to fall by a factor of five. | 2026-05 | Operator stated | totalenergies.com |
Systems at this site
| System | Rmax | Power | First operational | Status |
|---|---|---|---|---|
| Pangea 4 | - | - | 2024-07 | operational |
| Pangea III | 17.86 PFlop/s | 1.37 MW | 2019 | operational |
| Pangea II | 5.28 PFlop/s | 4.15 MW | 2016-06 | upgraded |
| Rostand | 106.10 TFlop/s | 442 kW | 2008 | operational |
| Pangea 5 | - | - | - | planned |
Facility fields are recorded only where a public source states them. Blank means we have not found one, not that the value is zero: an important distinction if you are aggregating power or PUE across sites.