Supercomputers/Sites/Black Pearl Site (Wink TX)
Wink, TX · USA
Black Pearl Site (Wink TX)
Operated by Cipher Mining. Hosting 1 system in this dataset, 0 of them currently operational.
- Systems hosted
- 1
- Installed Rmax
- 0.0 GFlop/s
- Recorded power
- 0 kW
- Cooling
- -
Facility facts
Power, cooling and efficiency figures for Black Pearl Site (Wink TX), each with its own source and date.
| Fact | Value | As of | Basis | Source |
|---|---|---|---|---|
| IT power | 216 MW Critical IT load under contract with Amazon Data Services | 2026 | Regulatory filing | sec.gov |
| Facility power | 300 MW Gross capacity; interconnection approval is for 300 MW | 2026 | Regulatory filing | sec.gov |
| Power supplier | ERCOT; new energized N+1 substation with interconnection at 138 kV under Oncor's transmission tariff, approved for 300 MW About 150 MW of existing bitcoin-mining infrastructure is to be retrofitted for HPC | 2026 | Regulatory filing | sec.gov |
Systems at this site
| System | Rmax | Power | First operational | Status |
|---|---|---|---|---|
| Cipher Black Pearl (AWS) | - | - | - | under construction |
Facility fields are recorded only where a public source states them. Blank means we have not found one, not that the value is zero: an important distinction if you are aggregating power or PUE across sites.