COMPUTE ATLAS Supercomputer supply-chain graph
1581 systems 558 sites Sourced data

Supercomputers/Sites/Black Pearl Site (Wink TX)

Wink, TX · USA

Black Pearl Site (Wink TX)

Operated by Cipher Mining. Hosting 1 system in this dataset, 0 of them currently operational.

Systems hosted
1
Installed Rmax
0.0 GFlop/s
all eras, as reported
Recorded power
0 kW
where disclosed
Cooling
-

Facility facts

Power, cooling and efficiency figures for Black Pearl Site (Wink TX), each with its own source and date.

FactValueAs ofBasisSource
IT power 216 MW Critical IT load under contract with Amazon Data Services 2026 Regulatory filing sec.gov
Facility power 300 MW Gross capacity; interconnection approval is for 300 MW 2026 Regulatory filing sec.gov
Power supplier ERCOT; new energized N+1 substation with interconnection at 138 kV under Oncor's transmission tariff, approved for 300 MW About 150 MW of existing bitcoin-mining infrastructure is to be retrofitted for HPC 2026 Regulatory filing sec.gov

Systems at this site

SystemRmaxPowerFirst operationalStatus
Cipher Black Pearl (AWS) - - - under construction

Facility fields are recorded only where a public source states them. Blank means we have not found one, not that the value is zero: an important distinction if you are aggregating power or PUE across sites.