Supercomputers/Sites/Cipher Barber Lake Campus
Colorado City, TX · USA
Cipher Barber Lake Campus
Operated by Cipher Mining. Hosting 1 system in this dataset, 0 of them currently operational.
- Systems hosted
- 1
- Installed Rmax
- 0.0 GFlop/s
- Recorded power
- 0 kW
- Cooling
- -
Facility facts
Power, cooling and efficiency figures for Cipher Barber Lake Campus, each with its own source and date.
| Fact | Value | As of | Basis | Source |
|---|---|---|---|---|
| IT power | 168 MW Critical IT load under the Fluidstack lease, due by September 2026 | 2025-09-25 | Regulatory filing | sec.govsec.gov |
| Facility power | 244 MW Gross capacity supporting the 168 MW of critical IT; the site has 300 MW of approved power and a signed MOU toward another 500 MW | 2025-09-25 | Regulatory filing | sec.govsec.gov |
Systems at this site
| System | Rmax | Power | First operational | Status |
|---|---|---|---|---|
| Barber Lake (Fluidstack) | - | - | - | under construction |
Facility fields are recorded only where a public source states them. Blank means we have not found one, not that the value is zero: an important distinction if you are aggregating power or PUE across sites.