MGHPCC Holyoke
Operated by Kempner Institute. Hosting 7 systems in this dataset, 7 of them currently operational.
- Systems hosted
- 7
- Installed Rmax
- 24.07 PFlop/s
- Recorded power
- 185.61 kW
- Cooling
- -
Facility facts
Power, cooling and efficiency figures for MGHPCC Holyoke, each with its own source and date.
| Fact | Value | As of | Basis | Source |
|---|---|---|---|---|
| Renewable share of supply | 100 percent Harvard Gazette: Holyoke municipal electric company supplies 100% carbon-free power from hydroelectric and solar sources. | 2024-11 | Operator stated | news.harvard.edu |
| Facility power | 15 MW MGHPCC executive director article dated 2013-03-12: peak power capacity of 15 MW. | 2013-03 | Operator stated | mghpcc.org |
| Power supplier | Holyoke Gas & Electric, which generates more than 70 percent of its power from Connecticut River hydroelectric plants Harvard LEED case study (2013) confirms purchase from Holyoke Gas & Electric and its hydro and solar mix. | 2013-03 | Operator stated | mghpcc.orgenergyandfacilities.harvard.edu |
| Cooling | Outside-air cooling and water-side economiser (free cooling for more than 70 percent of the year), hot-aisle containment feeding a chilled water loop Both pages from 2013 describe economiser and outside-air heat removal. | 2013-03 | Operator stated | energyandfacilities.harvard.edumghpcc.org |
Systems at this site
| System | Rmax | Power | First operational | Status |
|---|---|---|---|---|
| Cannon2-H200 | 4.24 PFlop/s | 91.61 kW | 2025-08 | operational |
| Kempner AI Cluster | 16.29 PFlop/s | - | 2023 | operational |
| Cannon (FASRC) | 2.08 PFlop/s | - | 2019 | upgraded |
| Satori (MIT) | 1.46 PFlop/s | 94 kW | 2019 | operational |
| Explorer (Northeastern) | - | - | - | operational |
| AICR | - | - | - | operational |
| Engaging (MIT) | - | - | - | operational |
Facility fields are recorded only where a public source states them. Blank means we have not found one, not that the value is zero: an important distinction if you are aggregating power or PUE across sites.