Supercomputers/Sites/MGHPCC Holyoke

Holyoke, MA · USA

MGHPCC Holyoke

Operated by Kempner Institute. Hosting 7 systems in this dataset, 7 of them currently operational.

Systems hosted
7
Installed Rmax
24.07 PFlop/s
all eras, as reported
Recorded power
185.61 kW
where disclosed
Cooling
-

Facility facts

Power, cooling and efficiency figures for MGHPCC Holyoke, each with its own source and date.

FactValueAs ofBasisSource
Renewable share of supply 100 percent Harvard Gazette: Holyoke municipal electric company supplies 100% carbon-free power from hydroelectric and solar sources. 2024-11 Operator stated news.harvard.edu
Facility power 15 MW MGHPCC executive director article dated 2013-03-12: peak power capacity of 15 MW. 2013-03 Operator stated mghpcc.org
Power supplier Holyoke Gas & Electric, which generates more than 70 percent of its power from Connecticut River hydroelectric plants Harvard LEED case study (2013) confirms purchase from Holyoke Gas & Electric and its hydro and solar mix. 2013-03 Operator stated mghpcc.orgenergyandfacilities.harvard.edu
Cooling Outside-air cooling and water-side economiser (free cooling for more than 70 percent of the year), hot-aisle containment feeding a chilled water loop Both pages from 2013 describe economiser and outside-air heat removal. 2013-03 Operator stated energyandfacilities.harvard.edumghpcc.org

Systems at this site

SystemRmaxPowerFirst operationalStatus
Cannon2-H200 4.24 PFlop/s 91.61 kW 2025-08 operational
Kempner AI Cluster 16.29 PFlop/s - 2023 operational
Cannon (FASRC) 2.08 PFlop/s - 2019 upgraded
Satori (MIT) 1.46 PFlop/s 94 kW 2019 operational
Explorer (Northeastern) - - - operational
AICR - - - operational
Engaging (MIT) - - - operational

Facility fields are recorded only where a public source states them. Blank means we have not found one, not that the value is zero: an important distinction if you are aggregating power or PUE across sites.