Operated by NCAR. Hosting 11 systems in this dataset, 0 of them currently operational.

Systems hosted
11
Installed Rmax
0.0 GFlop/s
all eras, as reported
Recorded power
854.9 kW
where disclosed
Cooling
-

Facility facts

Power, cooling and efficiency figures for NCAR Mesa Laboratory (Boulder), each with its own source and date.

FactValueAs ofBasisSource
Facility power 2 MW CISL slide at the ECMWF workshop of 2008-11-06 describes the Mesa Lab computing facility as a 2 MW facility, with 60 percent of power to computing and 40 percent to mechanical systems; historical. 2008-11 Operator stated ecmwf.int
IT power 1.2 MW 1.2 MW for computing, with UPS holding 1.2 MW for 15 minutes and two 1.5 MW diesel generators; historical 2008 slide. 2008-11 Operator stated ecmwf.int
Cooling Two 450-ton chillers feed water-cooled air handlers; two 1,500 gallon tanks store 44 F chilled water as a thermal buffer Historical 2008 slide; NCAR later moved its main supercomputing to the Wyoming centre. 2008-11 Operator stated ecmwf.int
Cooling For the Cray X-MP in 1986 the Mesa Laboratory computer room had its electrical power and grounding replaced and its cooling piping redesigned to add a backup chilled-water source 1986-10 Operator stated cisl.ucar.edu

Systems at this site

SystemRmaxPowerFirst operationalStatus
Antero 2 (NCAR C90) - 493.5 kW 1997-01 decommissioned
NCAR Cray T3D - 41.4 kW 1994-07 decommissioned
Graywolf (NCAR Cray-3) - 90 kW 1993-10 decommissioned
Littlebear (NCAR CM-5) - - 1993-04 decommissioned
Cray Y-MP - - 1990-05 decommissioned
CM-2 - - 1988-09 decommissioned
Cray X-MP - - 1986-10 decommissioned
NCAR Cray-1A S/N 14 - 115 kW 1983-05 decommissioned
NCAR Cray-1A S/N 3 - 115 kW 1977-07 decommissioned
NCAR CDC 7600 - - 1971-05 decommissioned
NCAR CDC 6600 - - 1965-12 decommissioned

Facility fields are recorded only where a public source states them. Blank means we have not found one, not that the value is zero: an important distinction if you are aggregating power or PUE across sites.