Supercomputers/Sites/TU Dresden ZIH
Dresden · Germany
TU Dresden ZIH
Operated by TU Dresden. Hosting 5 systems in this dataset, 4 of them currently operational.
- Systems hosted
- 5
- Installed Rmax
- 32.48 PFlop/s
- Recorded power
- 2.93 MW
- Cooling
- Direct liquid cooling, warm water
Facility facts
Power, cooling and efficiency figures for TU Dresden ZIH, each with its own source and date.
| Fact | Value | As of | Basis | Source |
|---|---|---|---|---|
| Machine-room floor area | 1,200 m2 Lehmann-Zentrum data centre (LZR) offers over 1200 m2 of machine room area; page undated, fetched 2026. | 2026 | Operator stated | tu-dresden.de |
| Heat reuse | Waste heat from the computers at the LZR is reused to heat surrounding buildings ZIH page undated, fetched 2026. | 2026 | Operator stated | tu-dresden.de |
| Cooling | Efficient warm-water cooling operated without chillers, plus optimised conventional air cooling for high power density ZIH page undated, fetched 2026. | 2026 | Operator stated | tu-dresden.de |
| PUE | 1.2 DLR says a PUE of 1.2 is achievable for its CARA cluster at the LZR; a stated capability rather than a measured annual figure; page undated, fetched 2026 | 2026 | Operator stated | dlr.de |
| Facility power | 1.9 MW Average total power supply as of September 2024 (infrastructure 15 percent, compute 78 percent, storage 7 percent). | 2024-09 | Operator stated | arxiv.org |
| Heat reuse | Local heating network supplied since 2016 (205 kW average, 360 kW maximum, energy reuse factor 0.12); 2 MW heat pump to a city district network planned from 2025 Table 3 of the survey; ZIH page confirms reuse for surrounding buildings. | 2024-09 | Operator stated | arxiv.orgtu-dresden.de |
| Cooling | Warm-water cooling of the HRSK-II system runs without chillers, which ZIH says saves over 250,000 euros a year in operating costs ZIH-Info newsletter on the 13 May 2015 inauguration of HRSK-II and the LZR data centre; waste heat is also reused on campus. | 2015-05-13 | Operator stated | tu-dresden.de |
Systems at this site
| System | Rmax | Power | First operational | Status |
|---|---|---|---|---|
| Capella | 24.06 PFlop/s | 444.79 kW | 2024-11 | operational |
| Barnard | 3.05 PFlop/s | 535.7 kW | 2023 | operational |
| AlphaCentauri | 2.59 PFlop/s | 163.65 kW | 2021 | operational |
| CARA | 1.75 PFlop/s | 1.20 MW | 2019 | operational |
| Taurus | 1.03 PFlop/s | 582 kW | 2015 | decommissioned |
Facility fields are recorded only where a public source states them. Blank means we have not found one, not that the value is zero: an important distinction if you are aggregating power or PUE across sites.