COMPUTE ATLAS Supercomputer supply-chain graph
1581 systems 558 sites Sourced data

Supercomputers/Sites/TU Dresden ZIH

Dresden · Germany

TU Dresden ZIH

Operated by TU Dresden. Hosting 5 systems in this dataset, 4 of them currently operational.

Systems hosted
5
Installed Rmax
32.48 PFlop/s
all eras, as reported
Recorded power
2.93 MW
where disclosed
Cooling
Direct liquid cooling, warm water

Facility facts

Power, cooling and efficiency figures for TU Dresden ZIH, each with its own source and date.

FactValueAs ofBasisSource
Machine-room floor area 1,200 m2 Lehmann-Zentrum data centre (LZR) offers over 1200 m2 of machine room area; page undated, fetched 2026. 2026 Operator stated tu-dresden.de
Heat reuse Waste heat from the computers at the LZR is reused to heat surrounding buildings ZIH page undated, fetched 2026. 2026 Operator stated tu-dresden.de
Cooling Efficient warm-water cooling operated without chillers, plus optimised conventional air cooling for high power density ZIH page undated, fetched 2026. 2026 Operator stated tu-dresden.de
PUE 1.2 DLR says a PUE of 1.2 is achievable for its CARA cluster at the LZR; a stated capability rather than a measured annual figure; page undated, fetched 2026 2026 Operator stated dlr.de
Facility power 1.9 MW Average total power supply as of September 2024 (infrastructure 15 percent, compute 78 percent, storage 7 percent). 2024-09 Operator stated arxiv.org
Heat reuse Local heating network supplied since 2016 (205 kW average, 360 kW maximum, energy reuse factor 0.12); 2 MW heat pump to a city district network planned from 2025 Table 3 of the survey; ZIH page confirms reuse for surrounding buildings. 2024-09 Operator stated arxiv.orgtu-dresden.de
Cooling Warm-water cooling of the HRSK-II system runs without chillers, which ZIH says saves over 250,000 euros a year in operating costs ZIH-Info newsletter on the 13 May 2015 inauguration of HRSK-II and the LZR data centre; waste heat is also reused on campus. 2015-05-13 Operator stated tu-dresden.de

Systems at this site

SystemRmaxPowerFirst operationalStatus
Capella 24.06 PFlop/s 444.79 kW 2024-11 operational
Barnard 3.05 PFlop/s 535.7 kW 2023 operational
AlphaCentauri 2.59 PFlop/s 163.65 kW 2021 operational
CARA 1.75 PFlop/s 1.20 MW 2019 operational
Taurus 1.03 PFlop/s 582 kW 2015 decommissioned

Facility fields are recorded only where a public source states them. Blank means we have not found one, not that the value is zero: an important distinction if you are aggregating power or PUE across sites.