Analysis 15

What a petaflop costs

57 systems in this dataset have both a stated cost and a measured Rmax. Restated in 2025 dollars, a GFlop/s of measured performance cost a median of $3.1 million on the 3 machines that first ran before 2000, and $3.8 on those that first ran from 2020: about 800 thousand times less. The fall was fastest early. Before 2010 the price fell tenfold every 3.7 years; since 2010 it has taken 10.3. The cheapest measured performance on record is El Capitan, at $0.42 per GFlop/s.

A stated cost is not an invoice. The figures here are what operators, funders, vendors and the trade press said a machine cost, and they cover different things: 41 are contract or purchase prices, 14 are grant awards that may also pay for operations or storage, and 2 are third-party estimates. A difference of two or three times between two machines can be a difference in what was counted. The trend survives that, because the points span 7 orders of magnitude.

This is also the measured world only. Of the 129 systems with a stated cost, 69 have no measured Rmax or carry the Rmax of a later configuration, and 3 costs paid for an upgrade rather than a machine. 55 of the 69 are AI or mixed AI and HPC systems, whose costs often include buildings and power and whose performance is quoted at low precision, so they cannot be placed on this axis.

Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1,350 of 1,581 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.

  • Contract or purchase price
  • Grant or funding award
  • Third-party estimate
Stated cost per GFlop/s of measured performance, in 2025 dollars, by first-light year Log-scale dot plot of each system’s stated cost, adjusted for US inflation, divided by its measured HPL performance, by the year it first ran, coloured by what kind of cost figure it is, with a line through the group medians. 0.1110100100010k100k1M10M19901995200020052010201520202025 median per group Touchstone Delta (Caltech) Contract or purchase price 3.06e+6 2025 US$ per GFlop/s, 1991 KISTI Cray Y-MP C916 Contract or purchase price 5.29e+6 2025 US$ per GFlop/s, 1993 ASCI Blue-Pacific Contract or purchase price 8.90e+4 2025 US$ per GFlop/s, 1998 ASCI White Grant or funding award 4.17e+4 2025 US$ per GFlop/s, 2000 Lemieux Grant or funding award 1.51e+4 2025 US$ per GFlop/s, 2001 CPTEC NEC SX-6 Contract or purchase price 1.69e+5 2025 US$ per GFlop/s, 2002 System X Contract or purchase price 885 2025 US$ per GFlop/s, 2003 LANL Lightning Contract or purchase price 2.17e+3 2025 US$ per GFlop/s, 2003 AVIDD Grant or funding award 3.09e+3 2025 US$ per GFlop/s, 2003 BigBen Grant or funding award 2.01e+3 2025 US$ per GFlop/s, 2005 Jacquard (NERSC) Contract or purchase price 2.64e+3 2025 US$ per GFlop/s, 2005 ASC Purple Contract or purchase price 5.98e+3 2025 US$ per GFlop/s, 2005 Encanto Grant or funding award 245 2025 US$ per GFlop/s, 2007 Eka Contract or purchase price 395 2025 US$ per GFlop/s, 2007 CPTEC Sun Fire Cluster Contract or purchase price 826 2025 US$ per GFlop/s, 2007 System G (Virginia Tech) Contract or purchase price 106 2025 US$ per GFlop/s, 2008 Kraken Grant or funding award 117 2025 US$ per GFlop/s, 2008 CHPC Blue Gene/P Contract or purchase price 125 2025 US$ per GFlop/s, 2008 Roadrunner Contract or purchase price 175 2025 US$ per GFlop/s, 2008 Ranger Grant or funding award 289 2025 US$ per GFlop/s, 2008 Chinook Contract or purchase price 309 2025 US$ per GFlop/s, 2009 Trestles (SDSC) Grant or funding award 61.4 2025 US$ per GFlop/s, 2010 HokieSpeed Grant or funding award 16.6 2025 US$ per GFlop/s, 2011 Mustang (LANL) Contract or purchase price 62.1 2025 US$ per GFlop/s, 2011 Lonestar 4 Contract or purchase price 68.2 2025 US$ per GFlop/s, 2011 Oakleaf-FX Third-party estimate 43.0 2025 US$ per GFlop/s, 2012 Olympus (PNNL) Contract or purchase price 60.4 2025 US$ per GFlop/s, 2012 Oakley Contract or purchase price 72.5 2025 US$ per GFlop/s, 2012 Gordon Grant or funding award 131 2025 US$ per GFlop/s, 2012 Stampede Grant or funding award 7.62 2025 US$ per GFlop/s, 2013 Cascade (PNNL) Contract or purchase price 9.25 2025 US$ per GFlop/s, 2013 Yemoja Contract or purchase price 63.8 2025 US$ per GFlop/s, 2014 Sky Bridge Grant or funding award 25.5 2025 US$ per GFlop/s, 2015 Sunway TaihuLight Contract or purchase price 3.89 2025 US$ per GFlop/s, 2016 Laconia Contract or purchase price 7.51 2025 US$ per GFlop/s, 2016 Ollie Contract or purchase price 11.2 2025 US$ per GFlop/s, 2016 Lonestar 5 Contract or purchase price 13.2 2025 US$ per GFlop/s, 2016 Owens Contract or purchase price 18.4 2025 US$ per GFlop/s, 2016 Pratyush Contract or purchase price 23.4 2025 US$ per GFlop/s, 2017 Quinde I Contract or purchase price 35.1 2025 US$ per GFlop/s, 2017 Aleph Contract or purchase price 11.9 2025 US$ per GFlop/s, 2018 Taiwania Contract or purchase price 14.0 2025 US$ per GFlop/s, 2018 NVIDIA DGX SuperPOD (V100) Third-party estimate 5.12 2025 US$ per GFlop/s, 2019 Expanse Grant or funding award 5.08 2025 US$ per GFlop/s, 2020 HiPerGator AI Contract or purchase price 2.24 2025 US$ per GFlop/s, 2021 Cambridge-1 Contract or purchase price 6.64 2025 US$ per GFlop/s, 2021 Komondor Contract or purchase price 4.54 2025 US$ per GFlop/s, 2022 Gaia Contract or purchase price 2.21 2025 US$ per GFlop/s, 2023 Crossroads Contract or purchase price 4.35 2025 US$ per GFlop/s, 2023 Nautilus Contract or purchase price 10.7 2025 US$ per GFlop/s, 2023 El Capitan Grant or funding award 0.418 2025 US$ per GFlop/s, 2024 Santos Dumont Contract or purchase price 1.39 2025 US$ per GFlop/s, 2024 Blueback Contract or purchase price 2.56 2025 US$ per GFlop/s, 2024 ARF CPU Cluster Contract or purchase price 3.76 2025 US$ per GFlop/s, 2024 UAlbany AI Supercomputer Contract or purchase price 5.34 2025 US$ per GFlop/s, 2024 ABCI 3.0 Contract or purchase price 1.60 2025 US$ per GFlop/s, 2025 Redtail Contract or purchase price 3.89 2025 US$ per GFlop/s, 2026 El CapitanSantos Dumont
Each dot is one system: its stated cost, adjusted for inflation, divided by its measured performance, on a logarithmic axis where each step is ten times the one below. The line joins the medians of the groups in the table.
Table view: Stated cost per GFlop/s of measured performance
First lightSystemsMedian 2025 US$ per GFlop/sCheapestDearest
1990 to 19993$3.1 millionASCI Blue-Pacific $89,034KISTI Cray Y-MP C916 $5.3 million
2000 to 20046$9,088System X $885CPTEC NEC SX-6 $169,401
2005 to 200912$299System G (Virginia Tech) $106ASC Purple $5,983
2010 to 201411$61Stampede $7.6Gordon $131
2015 to 201911$13Sunway TaihuLight $3.9Quinde I $35
2020 to date14$3.8El Capitan $0.42Nautilus $11
How this was calculated

Cost per GFlop/s is the stated cost in US dollars, restated in 2025 dollars, divided by the measured HPL Rmax in GFlop/s. Costs come from the stated-cost field of each system's profile, each with its own source; Rmax comes from the system's row. Costs first stated in another currency were converted by the source that reported them, not by us.

Inflation uses the US consumer price index for all urban consumers, annual average (FRED series CPIAUCSL). A cost is deflated from the earlier of the year it was stated and the year the machine first ran, since a figure reported years later was still spent when the machine was built, and a contract announced before first light was spent around the award. Systems are plotted at their first-light year.

Left out: costs that paid only for an upgrade, expansion or refresh of an existing machine (3), and systems recorded as upgraded, whose Rmax describes a later configuration. A machine expanded in place and not marked upgraded keeps its latest Rmax against its original cost, which makes it look cheaper than it was. The scope tag is read from each cost's note: a third-party estimate where the source is an estimate, a grant or funding award where the note says so, and a contract or purchase price otherwise.

The trend is the least-squares slope of the base-ten logarithm of cost per GFlop/s on first-light year: over all 57 systems it falls tenfold every 5.8 years (R² 0.87); on the 21 systems that first ran before 2010, every 3.7 years (R² 0.90); on the 36 since, every 10.3 years (R² 0.68). The later fit is looser, partly because its points span grant awards, contracts and street prices in a narrower range of years.

Record lows

Each system here was cheaper per GFlop/s than every system before it in this dataset.

First lightSystemCountryStated cost (US$ m, nominal)2025 US$ per GFlop/sCost figure
1991 Touchstone Delta (Caltech) USA 18.0 $3.1 million Contract or purchase price
1998 ASCI Blue-Pacific USA 93.0 $89,034 Contract or purchase price
2000 ASCI White USA 110 $41,652 Grant or funding award
2001 Lemieux USA 36.0 $15,082 Grant or funding award
2003 System X USA 5.20 $885 Contract or purchase price
2007 Encanto USA 20.0 $245 Grant or funding award
2008 System G (Virginia Tech) USA 1.20 $106 Contract or purchase price
2010 Trestles (SDSC) USA 2.80 $61 Grant or funding award
2011 HokieSpeed USA 1.40 $17 Grant or funding award
2013 Stampede USA 27.5 $7.6 Grant or funding award
2016 Sunway TaihuLight China 270 $3.9 Contract or purchase price
2021 HiPerGator AI USA 33.0 $2.2 Contract or purchase price
2023 Gaia Brazil 14.6 $2.2 Contract or purchase price
2024 El Capitan USA 600 $0.42 Grant or funding award

The read

The price of measured performance has not fallen at a steady rate. The steepest stretch is the move from vector machines and custom parallel systems to commodity clusters in the late 1990s and 2000s: the median cost per GFlop/s fell by a factor of 10,236 between the pre-2000 group and the 2005 to 2009 group. Since 2010 each tenfold fall has taken about 2.7 times as long as before. The data here cannot say why, and the post-2010 points are noisier, so read this as a slowdown in the price of FP64 performance on the machines that report it, not as a law.

In the latest group the three lowest prices belong to El Capitan ($0.42), Santos Dumont ($1.4), and ABCI 3.0 ($1.6). Grant-funded machines sit higher, partly because an award often pays for more than the hardware: since 2010, the 7 award figures have a median of $17 per GFlop/s against $9.3 for the 27 contract or purchase prices.

What this cannot measure is the AI build-out. Those machines are bought for low-precision arithmetic, so a cost per FP64 GFlop/s undervalues them, and their stated costs usually include land, buildings and power. The build pipeline covers that spending in megawatts instead.