Santa Teresa, NM · USA

Santa Teresa Project Jupiter Campus

Operated by STACK Infrastructure. Hosting 1 system in this dataset, 0 of them currently operational.

Systems hosted
1
Installed Rmax
0.0 GFlop/s
all eras, as reported
Recorded power
0 kW
where disclosed
Cooling
-

Facility facts

Power, cooling and efficiency figures for Santa Teresa Project Jupiter Campus, each with its own source and date.

FactValueAs ofBasisSource
Cooling Closed-loop pipe system, one-time fill then recycled; average about 20,000 gallons per day, capped at 60,000 2025-09 Press report elpasomatters.orgabqjournal.com
Power supplier Standalone microgrid of 700 to 900 MW of simple-cycle natural gas turbines, not connected to the El Paso Electric grid; drinking water from CRRUA 2025-09 Press report elpasomatters.org

Systems at this site

SystemRmaxPowerFirst operationalStatus
Stargate Project Jupiter (New Mexico) - - - under construction

Facility fields are recorded only where a public source states them. Blank means we have not found one, not that the value is zero: an important distinction if you are aggregating power or PUE across sites.