Supercomputers/Sites/Applied Digital Polaris Forge 2 Campus (Harwood)
Harwood, ND · USA
Applied Digital Polaris Forge 2 Campus (Harwood)
Operated by Applied Digital. Hosting 1 system in this dataset, 0 of them currently operational.
- Systems hosted
- 1
- Installed Rmax
- 0.0 GFlop/s
- Recorded power
- 0 kW
- Cooling
- -
Facility facts
Power, cooling and efficiency figures for Applied Digital Polaris Forge 2 Campus (Harwood), each with its own source and date.
| Fact | Value | As of | Basis | Source |
|---|---|---|---|---|
| IT power | 200 MW Critical IT load. | 2026-04 | Operator stated | ir.applieddigital.comir.applieddigital.com |
Systems at this site
| System | Rmax | Power | First operational | Status |
|---|---|---|---|---|
| Polaris Forge 2 (Harwood) | - | - | - | under construction |
Facility fields are recorded only where a public source states them. Blank means we have not found one, not that the value is zero: an important distinction if you are aggregating power or PUE across sites.