Supercomputers/Sites/Purdue RCAC (West Lafayette)
West Lafayette, IN · USA
Purdue RCAC (West Lafayette)
Operated by Purdue University. Hosting 6 systems in this dataset, 3 of them currently operational.
- Systems hosted
- 6
- Installed Rmax
- 14.01 PFlop/s
- Recorded power
- 2.76 MW
- Cooling
- -
Facility facts
Power, cooling and efficiency figures for Purdue RCAC (West Lafayette), each with its own source and date.
| Fact | Value | As of | Basis | Source |
|---|---|---|---|---|
| Facility power | 2.5 MW Purdue Campus CI Plan 2023: NSF-funded upgrades give the Math Building datacenter 2.5 MW of power and 525 tons of cooling; further expansion was under way. | 2023 | Operator stated | rcac.purdue.edu |
| Machine-room floor area | 641 m2 6,900 sq ft of datacenter space in the 1966 Mathematical Sciences Building (converted at 0.0929 m2 per sq ft). | 2023 | Operator stated | rcac.purdue.edu |
| Cooling | 525 tons of cooling capacity in the Math Building datacenter Campus CI Plan 2023. | 2023 | Operator stated | rcac.purdue.edu |
Systems at this site
| System | Rmax | Power | First operational | Status |
|---|---|---|---|---|
| Gautschi AI | 7.26 PFlop/s | 168 kW | 2024 | operational |
| Anvil | 3.56 PFlop/s | 792 kW | 2022-02 | operational |
| Bell (Purdue) | 1.62 PFlop/s | 314.6 kW | 2020-11 | operational |
| Rice (Purdue) | 407.14 TFlop/s | 726 kW | 2015 | decommissioned |
| Conte | 976.76 TFlop/s | 510 kW | 2013-07-30 | decommissioned |
| Carter (Purdue) | 186.90 TFlop/s | 252 kW | 2011-11 | decommissioned |
Facility fields are recorded only where a public source states them. Blank means we have not found one, not that the value is zero: an important distinction if you are aggregating power or PUE across sites.