Supercomputers/Sites/Crusoe Abilene Microsoft Campus
Abilene, TX · USA
Crusoe Abilene Microsoft Campus
Operated by Crusoe. Hosting 1 system in this dataset, 0 of them currently operational.
- Systems hosted
- 1
- Installed Rmax
- 0.0 GFlop/s
- Recorded power
- 0 kW
- Cooling
- Direct liquid cooling, warm water
Facility facts
Power, cooling and efficiency figures for Crusoe Abilene Microsoft Campus, each with its own source and date.
| Fact | Value | As of | Basis | Source |
|---|---|---|---|---|
| Power supplier | 900 MW behind-the-meter on-site power plant paired with a battery energy storage system | 2026-03 | Operator stated | crusoe.ai |
Systems at this site
| System | Rmax | Power | First operational | Status |
|---|---|---|---|---|
| Crusoe Abilene Campus (Microsoft) | - | - | - | under construction |
Facility fields are recorded only where a public source states them. Blank means we have not found one, not that the value is zero: an important distinction if you are aggregating power or PUE across sites.