COMPUTE ATLAS Supercomputer supply-chain graph
1581 systems 558 sites Sourced data

Supercomputers/Sites/Lancium Clean Campus (Abilene)

Abilene, TX · USA

Lancium Clean Campus (Abilene)

Operated by Crusoe. Hosting 1 system in this dataset, 1 of them currently operational.

Systems hosted
1
Installed Rmax
0.0 GFlop/s
all eras, as reported
Recorded power
0 kW
where disclosed
Cooling
Direct-to-chip cold plate

Facility facts

Power, cooling and efficiency figures for Lancium Clean Campus (Abilene), each with its own source and date.

FactValueAs ofBasisSource
Cooling Closed-loop direct-to-chip liquid cooling with zero evaporative water use 2025-03-18 Operator stated crusoe.aicrusoe.ai
Facility power 1,200 MW Grid interconnection and campus power capacity across eight buildings; design capacity, not measured draw. 2025-03-18 Operator stated crusoe.ai

Systems at this site

SystemRmaxPowerFirst operationalStatus
Stargate Abilene - - 2025-06 operational

Facility fields are recorded only where a public source states them. Blank means we have not found one, not that the value is zero: an important distinction if you are aggregating power or PUE across sites.