Supercomputers/Sites/TU Darmstadt Lichtwiese Campus
Darmstadt · Germany
TU Darmstadt Lichtwiese Campus
Operated by TU Darmstadt. Hosting 2 systems in this dataset, 2 of them currently operational.
- Systems hosted
- 2
- Installed Rmax
- 6.25 PFlop/s
- Recorded power
- 690 kW
- Cooling
- -
Facility facts
Power, cooling and efficiency figures for TU Darmstadt Lichtwiese Campus, each with its own source and date.
| Fact | Value | As of | Basis | Source |
|---|---|---|---|---|
| Cooling | Direct hot-water cooling with return temperatures above 45 degrees C | 2026 | Operator stated | hkhlr.de |
| Heat reuse | During the heating season a significant share of the waste heat feeds the district heating network of the Lichtwiese campus | 2026 | Operator stated | hkhlr.de |
| Cooling | Direct hot-water cooling for Lichtenberg II, with return temperatures above 45 C | 2023-07 | Operator stated | hrz.tu-darmstadt.dehkhlr.de |
| Heat reuse | Waste heat from Lichtenberg II is fed into the Lichtwiese campus district heating network during the heating period | 2023-07 | Operator stated | hrz.tu-darmstadt.dehkhlr.de |
| Machine-room floor area | 384 m2 Main usable area of the building opened for Lichtenberg I in June 2013; gross floor area 1,270 m2 and gross volume 6,217 m3 | 2013-06 | Operator stated | tu-darmstadt.de |
| Cooling | Low-loss water cooling for Lichtenberg I, with building services allowing largely free cooling without chillers | 2013-06 | Operator stated | tu-darmstadt.de |
| IT power | 0.65 MW TU Darmstadt's estimated maximum draw of Lichtenberg I once its second stage was installed in 2014 | 2013-06 | Operator stated | tu-darmstadt.de |
Systems at this site
| System | Rmax | Power | First operational | Status |
|---|---|---|---|---|
| Lichtenberg II Phase 2 | 3.10 PFlop/s | - | 2023 | operational |
| Lichtenberg II | 3.15 PFlop/s | 690 kW | 2020 | operational |
Facility fields are recorded only where a public source states them. Blank means we have not found one, not that the value is zero: an important distinction if you are aggregating power or PUE across sites.