Supercomputers/Sites/Vantage Frontier Campus (Shackelford County)

Shackelford County, TX · USA

Vantage Frontier Campus (Shackelford County)

Operated by Vantage Data Centers. Hosting 1 system in this dataset, 0 of them currently operational.

Systems hosted
1
Installed Rmax
0.0 GFlop/s
all eras, as reported
Recorded power
0 kW
where disclosed
Cooling
-

Facility facts

Power, cooling and efficiency figures for Vantage Frontier Campus (Shackelford County), each with its own source and date.

FactValueAs ofBasisSource
Facility power 1,400 MW Full build-out capacity across 10 buildings. 2025-08-19 Operator stated vantage-dc.comconstructionowners.com
Machine-room floor area 343,741 m2 3.7 million sq ft across 10 buildings on 1,200 acres, converted from square feet. 2025-08-19 Operator stated vantage-dc.comconstructionowners.com
Cooling Liquid cooling plus closed-loop chiller system; racks of 250 kW and above 2025-08-19 Operator stated vantage-dc.comconstructionowners.com

Systems at this site

SystemRmaxPowerFirst operationalStatus
Stargate Shackelford County (Frontier) - - - under construction

Facility fields are recorded only where a public source states them. Blank means we have not found one, not that the value is zero: an important distinction if you are aggregating power or PUE across sites.