Supercomputers/Sites/Microsoft Atlanta AI datacenter site
Atlanta, GA · USA
Microsoft Atlanta AI datacenter site
Operated by Microsoft. Hosting 1 system in this dataset, 1 of them currently operational.
- Systems hosted
- 1
- Installed Rmax
- 0.0 GFlop/s
- Recorded power
- 0 kW
- Cooling
- -
Facility facts
Power, cooling and efficiency figures for Microsoft Atlanta AI datacenter site, each with its own source and date.
| Fact | Value | As of | Basis | Source |
|---|---|---|---|---|
| Cooling | Facility-wide closed-loop liquid cooling with no evaporation plus rack-level direct liquid cooling | 2025-11-12 | Operator stated | blogs.microsoft.com |
| Power supplier | Highly available utility grid power (utility not named by Microsoft); no on-site generation, UPS or dual-corded distribution for the GPU fleet, with on-site energy storage planned to smooth load swings | 2025-11-12 | Operator stated | blogs.microsoft.com |
Systems at this site
| System | Rmax | Power | First operational | Status |
|---|---|---|---|---|
| Microsoft Fairwater (Atlanta) | - | - | - | operational |
Facility fields are recorded only where a public source states them. Blank means we have not found one, not that the value is zero: an important distinction if you are aggregating power or PUE across sites.