Operated by KISTI. Hosting 5 systems in this dataset, 3 of them currently operational.
- Systems hosted
- 5
- Installed Rmax
- 14.25 PFlop/s
- Recorded power
- 1.88 MW
- Cooling
- -
Facility facts
Power, cooling and efficiency figures for KISTI, each with its own source and date.
| Fact | Value | As of | Basis | Source |
|---|---|---|---|---|
| Facility power | 20 MW KISTI slide (April 2024): 20 MW dedicated dual power lines from two substations; 11.4 MW UPS gives at least 20 minutes of backup for compute and storage; 5 MVA diesel generators back up cooling. | 2024-04 | Operator stated | indico.cern.ch |
| PUE | 1.34 KISTI-5 (Nurion) era PUE of 1.34, down from 1.58 for KISTI-4, from water-side economiser, free-cooling chiller and dynamic chiller control; averaging period not stated. | 2024-04 | Operator stated | indico.cern.ch |
| Cooling | Chilled-water cooling with rear-door heat exchangers on KISTI-5; KISTI-6 planned with indirect water cooling (PUE 1.3) or direct water cooling (PUE 1.1) options The PUE 1.3 and 1.1 figures for KISTI-6 are planning targets on the same slide. | 2024-04 | Operator stated | indico.cern.ch |
| PUE | 1.35 KISTI-5 procurement slide lists facility PUE 1.35. | 2020-06 | Operator stated | mug.mvapich.cse.ohio-state.edu |
Systems at this site
| System | Rmax | Power | First operational | Status |
|---|---|---|---|---|
| Nurion | 13.93 PFlop/s | - | 2018-10 | operational |
| Tachyon II | 274.80 TFlop/s | 1.27 MW | 2009 | decommissioned |
| KISTI GAIA | 23.37 TFlop/s | 480 kW | 2009 | operational |
| Tachyon | 16.99 TFlop/s | 129 kW | 2008 | operational |
| KISTI-6 | - | - | - | under construction |
Facility fields are recorded only where a public source states them. Blank means we have not found one, not that the value is zero: an important distinction if you are aggregating power or PUE across sites.