Supercomputers/Sites/Iskandar Halal Park (Racks Central)
Pasir Gudang, Johor · Malaysia
Iskandar Halal Park (Racks Central)
Operated by Racks Central. Hosting 1 system in this dataset, 0 of them currently operational.
- Systems hosted
- 1
- Installed Rmax
- 0.0 GFlop/s
- Recorded power
- 0 kW
- Cooling
- -
Facility facts
Power, cooling and efficiency figures for Iskandar Halal Park (Racks Central), each with its own source and date.
| Fact | Value | As of | Basis | Source |
|---|---|---|---|---|
| IT power | 70 MW Phase A (RCJM1) IT load; the campus totals up to 510 MW. | 2026-06 | Operator stated | rackscentral.com |
| Power supplier | Johor Special Water supplies RCJM1 and RCJM2A; water drawn from the Iskandar Reservoir and treated in-house | 2026-06 | Press report | w.media |
Systems at this site
| System | Rmax | Power | First operational | Status |
|---|---|---|---|---|
| Racks Central RCJM AI Campus | - | - | - | under construction |
Facility fields are recorded only where a public source states them. Blank means we have not found one, not that the value is zero: an important distinction if you are aggregating power or PUE across sites.