Supercomputers/Sites/KMA Supercomputer Centre (Ochang)
Ochang, Chungcheongbuk-do · South Korea
KMA Supercomputer Centre (Ochang)
Operated by Korea Meteorological Administration. Hosting 4 systems in this dataset, 3 of them currently operational.
- Systems hosted
- 4
- Installed Rmax
- 5.46 PFlop/s
- Recorded power
- 4.59 MW
- Cooling
- -
Facility facts
Power, cooling and efficiency figures for KMA Supercomputer Centre (Ochang), each with its own source and date.
| Fact | Value | As of | Basis | Source |
|---|---|---|---|---|
| Facility power | 14 MW Substation input capacity of 14,000 kW at 22.9 kV, with transformers totalling 17,000 kVA; a supply capacity, not a measured draw. Page copyright 2021. | 2021 | Operator stated | weather.go.kr |
| Power supplier | KEPCO grid supply at 22.9 kV (three-phase, four-wire) over dual main and sub lines Backed by five diesel generators totalling 10,750 kW with 86,000 litres of fuel, and 13,500 kVA of UPS giving 15 to 20 minutes on battery | 2021 | Operator stated | weather.go.kr |
| Cooling | Chilled water below 8 C from turbo refrigerators (four 500 RT and two 650 RT) with closed cooling towers usable year-round and 330 t and 160 t thermal storage tanks; HEPA-filtered, top-down air supply in the machine room Machine-room air handling: 23 thermo-hygrostat units of 30 RT. Page copyright 2021. | 2021 | Operator stated | weather.go.kr |
Systems at this site
| System | Rmax | Power | First operational | Status |
|---|---|---|---|---|
| Nuri | 2.40 PFlop/s | 1.36 MW | 2015 | operational |
| Miri | 2.40 PFlop/s | 1.36 MW | 2015 | operational |
| Uri | 345.60 TFlop/s | 159.64 kW | 2014-12 | operational |
| Haedam | 316.40 TFlop/s | 1.71 MW | 2010 | decommissioned |
Facility fields are recorded only where a public source states them. Blank means we have not found one, not that the value is zero: an important distinction if you are aggregating power or PUE across sites.