Operated by IREN. Hosting 1 system in this dataset, 0 of them currently operational.
- Systems hosted
- 1
- Installed Rmax
- 0.0 GFlop/s
- Recorded power
- 0 kW
- Cooling
- -
Facility facts
Power, cooling and efficiency figures for Sweetwater Hub Site (TX), each with its own source and date.
| Fact | Value | As of | Basis | Source |
|---|---|---|---|---|
| Facility power | 2,000 MW Sweetwater 1 is 1,400 MW and Sweetwater 2 is 600 MW; the 10-K lists the same split. | 2026 | Operator stated | iren.comsec.gov |
| Cooling | Air and liquid cooling at both Sweetwater 1 and Sweetwater 2 | 2026 | Operator stated | iren.com |
| Power supplier | Direct connection to the ERCOT grid; 1,400 MW 345kV/138kV bulk substation at Sweetwater 1 to be energized 2026 and Sweetwater 2 in 2027 The 10-K gives energization targets of Q2 2026 and Q4 2027. | 2026 | Operator stated | iren.comsec.gov |
Systems at this site
| System | Rmax | Power | First operational | Status |
|---|---|---|---|---|
| IREN Sweetwater Hub | - | - | - | under construction |