COMPUTE ATLAS Supercomputer supply-chain graph
1581 systems 558 sites Sourced data

Supercomputers/Sites/Hut 8 Beacon Point Campus

Nueces County, TX · USA

Hut 8 Beacon Point Campus

Operated by Hut 8. Hosting 1 system in this dataset, 0 of them currently operational.

Systems hosted
1
Installed Rmax
0.0 GFlop/s
all eras, as reported
Recorded power
0 kW
where disclosed
Cooling
-

Facility facts

Power, cooling and efficiency figures for Hut 8 Beacon Point Campus, each with its own source and date.

FactValueAs ofBasisSource
Power supplier AEP Texas, under a 1,000 MW interconnection agreement for the campus Each 352 MW IT phase needs about 500 MW of utility capacity. 2026-05-06 Operator stated prnewswire.comstocktitan.net

Systems at this site

SystemRmaxPowerFirst operationalStatus
Beacon Point (Hut 8) - - - under construction

Facility fields are recorded only where a public source states them. Blank means we have not found one, not that the value is zero: an important distinction if you are aggregating power or PUE across sites.