Supercomputers/Sites/CSCS, Lugano
Lugano · Switzerland
CSCS, Lugano
Operated by CSCS. Hosting 3 systems in this dataset, 1 of them currently operational.
- Systems hosted
- 3
- Installed Rmax
- 456.8 PFlop/s
- Recorded power
- 9.84 MW
- Cooling
- Direct liquid cooling, warm water, Liquid-assisted air (in-cabinet coil)
Systems at this site
| System | Rmax | Power | First operational | Status |
|---|---|---|---|---|
| Alps | 434.9 PFlop/s | 7.12 MW | 2024-03 | operational |
| Piz Daint | 21.23 PFlop/s | 2.38 MW | 2017-06 | decommissioned |
| Blue Brain IV | 715.55 TFlop/s | 328.75 kW | 2013 | decommissioned |
Facility fields are recorded only where a public source states them. Blank means we have not found one, not that the value is zero: an important distinction if you are aggregating power or PUE across sites.