COMPUTE ATLAS Supercomputer supply-chain graph
1581 systems 558 sites Sourced data

Supercomputers/Systems/El Khawarizmi Supercomputer

Tunisia · under construction · mixed

El Khawarizmi Supercomputer

Also known as CCK HPC, Centre de Calcul El Khawarizmi supercomputer

Operated by CCK at Centre de Calcul El Khawarizmi (Manouba) .

Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1,350 of 1,581 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.

Measured performance

Rmax
-
Rpeak
-
Rmax ÷ Rpeak
-
Cores
-
Power
-
Per watt
- GF/W

Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.

What this machine is made of

One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.

Role Part Supplier at build Quantity Confidence Source
Integrator -
ZTE, part of the SOHO-ZTE-DSHELL consortium named by CCK, handled installation, integration, configuration and commissioning of the China-donated HPC system
ZTE - Reported cck.rnu.tn

Engineering, funding and access

What El Khawarizmi Supercomputer runs on, who paid for it and how people get time on it. Each line carries who said it and when.

Funding

ItemDetailAs ofBasisSource
Funded byChinese donation valued at 10.6 million US dollars (32 million Tunisian dinars)2026-07Press reportentreprises-magazine.com
Funded byCentre de Calcul El Khawarizmi, about 3 million dinars for premises, extra equipment and preparatory studies2026-07Press reportentreprises-magazine.com
Stated cost10.6 USD mValue of the Chinese donation, equal to 32 million dinars; the whole project cost about 35 million dinars2026-07Press reportentreprises-magazine.com
ProcurementProject launched in 2013; the equipment came as a Chinese donation and a five-person Chinese team of engineers and technicians supported the Tunisian staff during preparationEntreprises Magazine citing the TAP news agency2026-07Press reportentreprises-magazine.com

The read

Tunisia's first high-performance computing system, donated by the People's Republic of China to the Centre de Calcul El Khawarizmi (CCK) at the University of Manouba under bilateral cooperation. The donation itself is valued at about 10.6 million dollars (32 million Tunisian dinars) against a total project cost near 35 million dinars once CCK's own facility and complementary-equipment spending is included, according to Tunisian press including La Presse, Entreprises Magazine and Tunisie Numerique. CCK's own account of the 23 July 2026 inauguration ceremony thanks a SOHO-ZTE-DSHELL consortium, naming ZTE explicitly, for the installation, integration, configuration and commissioning of the system, with SOHO's Lingyuan Yang credited as deployment project manager; no other source found corroborates ZTE's specific role, so that fact is treated as single-sourced. Tunisian press describes the machine as the third most powerful supercomputer on the African continent after South Africa and Morocco, and reports a pilot and training phase of more than three months for the university community beginning at the inauguration, ahead of official commissioning, which is why status is recorded here as under_construction rather than operational. No source found gives a model name, processor or GPU specification, core count, FLOPS figure or power draw, so those fields are left blank rather than guessed.

Timeline

  • 2025-12-04 Announced source
  • 2026-07 CCK began a trial period of more than three months ahead of full commissioning, supported by a five-person Chinese engineering team source

Site & facility

Centre de Calcul El Khawarizmi (Manouba)

Location
Manouba, Tunisia
Commissioned
2026

Change history

Source check

We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.

Cited sourceResultFound on the page
cck.rnu.tnnames system only-
entreprises-magazine.comnames system only-

Checked 2026-10-18 by pnpm verify. Re-run it and the table changes with the web.

Further reading