Supercomputers/Sites/Vienna Scientific Cluster
Vienna · Austria
Vienna Scientific Cluster
Operated by Vienna Scientific Cluster. Hosting 5 systems in this dataset, 2 of them currently operational.
- Systems hosted
- 5
- Installed Rmax
- 5.82 PFlop/s
- Recorded power
- 1.57 MW
- Cooling
- Direct liquid cooling, warm water
Facility facts
Power, cooling and efficiency figures for Vienna Scientific Cluster, each with its own source and date.
| Fact | Value | As of | Basis | Source |
|---|---|---|---|---|
| Cooling | VSC-5 mostly uses direct hot-water cooling (ColdCon) at up to 50 C with year-round free cooling; power supplies and switches are air-cooled with in-row coolers ASC page for VSC-5 (TOP500 rank 301, June 2022); page undated. | 2022 | Operator stated | asc.ac.at |
| Heat reuse | Waste heat from VSC-5 direct water cooling can be reused to produce hot water or support the existing heating infrastructure Stated as a capability, no reuse volume given. | 2022 | Operator stated | asc.ac.at |
Systems at this site
| System | Rmax | Power | First operational | Status |
|---|---|---|---|---|
| VSC-5 | 2.31 PFlop/s | 516 kW | 2022 | operational |
| VSC-4 | 2.73 PFlop/s | - | 2019 | operational |
| VSC-3 | 596.01 TFlop/s | 450 kW | 2014 | decommissioned |
| VSC-2 | 152.90 TFlop/s | 430 kW | 2011-05 | decommissioned |
| VSC-1 | 35.48 TFlop/s | 178 kW | 2009-11 | decommissioned |
Facility fields are recorded only where a public source states them. Blank means we have not found one, not that the value is zero: an important distinction if you are aggregating power or PUE across sites.