Supercomputers/Sites/TeraWulf Abernathy Campus
Abernathy, TX · USA
TeraWulf Abernathy Campus
Operated by TeraWulf. Hosting 1 system in this dataset, 0 of them currently operational.
- Systems hosted
- 1
- Installed Rmax
- 0.0 GFlop/s
- Recorded power
- 0 kW
- Cooling
- -
Facility facts
Power, cooling and efficiency figures for TeraWulf Abernathy Campus, each with its own source and date.
| Fact | Value | As of | Basis | Source |
|---|---|---|---|---|
| IT power | 168 MW Critical IT load | 2025-10 | Operator stated | investors.terawulf.com |
| Facility power | 240 MW Gross load | 2025-10 | Operator stated | investors.terawulf.com |
Systems at this site
| System | Rmax | Power | First operational | Status |
|---|---|---|---|---|
| Abernathy (Fluidstack) | - | - | - | under construction |
Facility fields are recorded only where a public source states them. Blank means we have not found one, not that the value is zero: an important distinction if you are aggregating power or PUE across sites.