Supercomputers/Sites/TensorWave Tucson Data Center
Tucson, AZ · USA
TensorWave Tucson Data Center
Operated by TensorWave. Hosting 1 system in this dataset, 1 of them currently operational.
- Systems hosted
- 1
- Installed Rmax
- 0.0 GFlop/s
- Recorded power
- 0 kW
- Cooling
- Direct-to-chip cold plate
Facility facts
Power, cooling and efficiency figures for TensorWave Tucson Data Center, each with its own source and date.
| Fact | Value | As of | Basis | Source |
|---|---|---|---|---|
| Cooling | Direct liquid cooling and high-rack-density designs, operated with TECfusions | 2026-01 | Press report | foley.comhpcwire.com |
Systems at this site
| System | Rmax | Power | First operational | Status |
|---|---|---|---|---|
| TensorWave Tucson MI325X Cluster | - | - | 2025-07 | operational |
Facility fields are recorded only where a public source states them. Blank means we have not found one, not that the value is zero: an important distinction if you are aggregating power or PUE across sites.