Supercomputers/Sites/Stargate UAE campus (Abu Dhabi)
Abu Dhabi · United Arab Emirates
Stargate UAE campus (Abu Dhabi)
Operated by G42. Hosting 1 system in this dataset, 0 of them currently operational.
- Systems hosted
- 1
- Installed Rmax
- 0.0 GFlop/s
- Recorded power
- 0 kW
- Cooling
- -
Facility facts
Power, cooling and efficiency figures for Stargate UAE campus (Abu Dhabi), each with its own source and date.
| Fact | Value | As of | Basis | Source |
|---|---|---|---|---|
| Power supplier | Campus to be powered by nuclear, solar and natural gas; part of the 5 GW UAE-US AI Campus in Abu Dhabi | 2025-05-22 | Operator stated | g42.ai |
| Facility power | 1,000 MW Stargate UAE cluster capacity target; first phase 200 MW. The wider campus is planned at 5 GW. | 2025-05-22 | Operator stated | g42.aithenationalnews.com |
Systems at this site
| System | Rmax | Power | First operational | Status |
|---|---|---|---|---|
| Stargate UAE | - | - | - | under construction |
Facility fields are recorded only where a public source states them. Blank means we have not found one, not that the value is zero: an important distinction if you are aggregating power or PUE across sites.